Laserfiche WebLink
Elk River Fire Department <br />Elk River, MN <br />Fire Station Feasibility and Facilities Study <br /> <br /> <br />Five Bugles Design <br />A Division of Wendel Companies <br />SECTION NO. 5 - CONCLUSIONS AND RECOMMENDATIONS <br /> <br />The following recommendations and conclusions are offered in the order of importance that they should <br />be considered in future planning. <br /> <br />Conclusion No. 1: Response time mapping of current station locations indicates some gaps in coverage. <br />These gaps in coverage are exacerbated by barriers such as limited access highways, the Mississippi <br />River, and general traffic congestion at peak travel times. <br />Recommendation: Construct a new, 17,500 SF, 3 bay, satellite fire station on the east side of Highway <br />169. Total project cost will range from $4.7M to $5.5M. <br />Conclusion No. 2: Some of the gaps in coverage are occurring in portions of the City of Otsego served <br />by the Elk River Fire Department. Mapping shows that solving this issue with a new station in Otsego <br />will also reduce response times to the southern portions of Elk River, espe cially during heavy traffic <br />times. <br />Recommendation: Work with the City of Otsego to construct a new, 17,500 SF, 3 bay, satellite fire <br />station similar to the new East Station for City of Elk River. Total project cost will range from $4.7M to <br />$5.5M. The study assumes the station would be financed by the City of Otsego and operated by Elk <br />River Fire Department. <br />Conclusion No. 3: Station No. 2, Elk River Fire Department’s Headquarters station in the Public Safety <br />Building provides a good base of operations for the department’s full time staff. However, it is lacking in <br />station personnel (paid-on-call staff who report to this station) support spaces such as locker rooms, <br />showers, offices and dayroom facilities. Construction of a new East Fire Station will also create an equity <br />issue between the stations. <br />Recommendation: Construct an addition to Station No. 2 of approximately 3,800 SF to include support <br />spaces for station staff. Project Cost will range from $850K to $1M. <br />Conclusion No. 4: The Elk River Fire Department’s Firefighter Training Program has become a regional <br />asset and revenue generator. A small increase in the size of the existing training room will allow this <br />activity to continue and to grow. <br />Recommendation: Expand the training room at Station No. 2 to incorporate the kitchen as part of the <br />expansion project outlined in Conclusion No. 3. Costs for this work are included with Recommendation <br />No. 3. <br />Conclusion No. 5 (Police Department): In 2003, the Elk River Police Department planned in expansion <br />space in the form of 4,000 SF of shell space on a second floor. They have experienced enough growth in <br />the intermediate years to warrant building out that space, as well as to construct minor changes <br />throughout the facility to improve workflow. <br /> <br />16