Laserfiche WebLink
Elk River Fire Department <br />Elk River, MN <br />Fire Station Feasibility and Facilities Study <br /> <br /> <br />Five Bugles Design <br />A Division of Wendel Companies <br />2.2 - Proposed East Station and Otsego Station (Elk River Station No. 3 and Otsego Station) <br />The station location portion of the study recommends a satellite station on the east side of Highway 169 <br />as well as one south of the Mississippi River. These stations could be essentially identical, three bay <br />stations. <br /> <br />Probable Cost for these Stations are developed using square foot costs. Low and high ranges are <br />established due to the early nature of the project. The range is established using costs from Engineering <br />New Record (a national construction cost source) and Five Bugles Designs historical cost data base. It <br />should be assumed that the final construction cost will fall between the low and high range. <br /> <br /> Low Range High Range <br />Cost of Construction $3,735,370 $4,134,503 <br />Other Costs (FF&E, Technology, <br />Contingencies, Fees and Legal) <br />$1,017,680 $1,408,357 <br />Total $4,735,050 $5,542,860 <br />SPACE 20 YEAR NEED <br />Apparatus Bays 5,040 SF <br />Apparatus Support 3,252 SF <br />Training 4,413 SF <br />Administration/Office 1,630 SF <br />Living Quarters 900 SF <br />Mechanical and Electrical Spaces 2,285 SF <br />Total 17,520 SF <br />Potential East Station Site on City Owned Property at 191 St. Ave NW and Cleveland St. NW <br />8