My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
08-21-2017
>
8.1. SR 08-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 4:21:20 PM
Creation date
8/17/2017 4:10:52 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT 2017 ELK RIVER BASEBALL DUGOUTS QUOTE FORM <br />CITY OF ELK RIVER <br />OWNER:City of Elk River 3.27.17 <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />SUBMITTED BY: <br />Name <br />Address Telephone <br />Fax <br />email <br />Contact <br />PROJECT DESCRIPTION <br />OFFER <br />OWNER'S RIGHT <br />AWARD OF CONTRACT <br />No. Section Description Unit Unit Price Total (unit x qty) <br />1 Structural concrete slab and base material 320.00 SF -$ -$ each dug out <br />2 INSTALL 8 post steel dug out roof structure - Supplied by OWNER 1.00 EA -$ -$ each dug out <br />3 6FT HT Chain link fencing and 2 posts- galvanized 68.00 LF -$ -$ each dug out <br />4 Remove existing chain link fencing and make adjustments 1.00 EA -$ -$ each dug out <br /> Total for each dug out -$ each dug out <br /> multiply by 8 dugouts x 8 <br />BASE BID TOTAL FOR 8 DUGOUTS -$ 8 dugouts <br />Est. Qty. <br />A. BASE BID WORK AT YAC AND OAK KNOLL PARKS <br />The undersigned, being familiar with the local conditions affecting the cost of the work and with the Contract Documents, including the Drawings and ANY <br />Addenda, and in accordance with the provisions thereof, hereby propose to furnish all labor, materials, and equipment necessary to complete construction for DUG <br />OUT WORK in Elk River Parks. <br />Estimated quantities listed on bid form or clarified in Addendum will be used along with bidders submitted unit prices and lump sum prices to tabulate bid totals. <br />Each submitted bid will be calculated using the same estimated quantities.Estimated Quantities shown on the Bid Form are not guaranteed. “UNIT PRICE” bids <br />Shall include all labor, materials, storing, equipment, overhead, profit, insurance, tags, etc., necessary to cover the work described in the Contract Documents. Final <br />payment to the Contractor for “UNIT PRICE” bid items shall be based on the actual authorized and installed Contractor’s bid quantities. <br />Each bidder must verify or establish quantities and the extent of work to their own satisfaction for “LUMP SUM” bid items, and submit a total bid sufficient to cover <br />all the work outlined in the Contract Documents, “LUMP SUM” bids shall include all labor, materials, storing, equipment, overhead, profit, insurance, tags, etc., <br />necessary to cover the work described in the Contract Documents. Final payment to the Contractor for “LUMP SUM” bid items shall be based on the Contractor’s <br />bid price for completion of the work outlined in the Contract Documents. <br />The Bidder is familiar with the PLANS and understands the provisions thereof. The bidder is responsible for reviewing the site conditions (both surface and subsoil) <br />and Contract Documents to establish a clear understanding of the work within the scope of this project. The bidder shall not rely on verbal information obtained from <br />employees of the Owner or Consultant. <br />Work as indicated in plans at two separate park locations (Oak Knoll Park, and Youth Athletic Field ( YAC) <br />Contractor to verify work in field with owner. <br />The Contract for the work outlined in the Contract Documents and this Bid Form, will be awarded to the lowest qualified quote. Lowest quote will be determined <br />by the TOTAL BID PRICE for the accepted bid items and quantities, plus any alternates chosen by owner. <br />The Owner reserves the right to revise the scope of the work outlined on the Contract Documents and listed above in the bid schedule. The Owner, based on budgetary <br />considerations, reserves the right to eliminate a particular line item. “Lump Sum” and “Unit Price” bids in the Bid Schedule shall prevail for eliminating or changing <br />quantities of work items from those indicated in the Contract Documents. <br />I hereby propose and agree to furnish all labor, materials, removal, overhead, profit, insurance, and other costs required to complete the Base Bid Work FOR <br />(8) EIGHT DUGOUTS at 2 parks described in the Drawings for the following amount. <br />WRITTEN: ______________________________________________________________________________DOLLARS <br />NUMERICAL: $ ____________________________________ <br />1 of 2 <br />ELK RIVER DUGOUTS <br />Quote Form 3.27.17
The URL can be used to link to this page
Your browser does not support the video tag.