My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
08-21-2017
>
4.7. SR 08-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 2:51:11 PM
Creation date
8/17/2017 2:49:38 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
limited to, the following: <br />a. Total costs of the work to be performed; <br />b. Qualifications, license, bonding, and insurance of personnel; <br />c. Timeline of the work; <br />d. Similar work experience; <br />e. References. <br />B. Upon conclusion of the selection, staff will select a contractor to negotiate a contract as follows: <br />a. The City shall not be liable for any expenses incurred by the Contractor prior to the <br />signing of a contract including, but not limited to, the Proposal preparation, attendance <br />at interviews, or final contract negotiations. <br />b. The Proposal must be signed in ink by an official authorized to bind the Contractor to its <br />provisions that will be included as part of an eventual contract. The Proposal must <br />include a statement as to the period during which the Proposal remains valid. This <br />period must be at least 90 days from the date of the submittal. <br />c. The City reserves the right to reject any and all Proposals submittals or to request <br />additional information from any or all of the proposing contractors. <br />C. This request does not commit the City of Elk River to award a contract, to pay any costs <br />incurred in the preparation of the proposal to this request, or to enter into a contract for <br />services. The City is not required to select the lowest bidder, based on other criteria. The City <br />of Elk River reserves the right to accept or reject any or all proposals received as a result of this <br />request, to negotiate with any qualified source, or to cancel in part or its entirety this Request <br />for Quotes if it is in the best interest of the City to do so. The City Council has final approval of <br />the contractor to complete the proposal. A recommendation from the staff to the City Council <br />will be made following review of the proposals. The City may require the responder selected to <br />provide additional information on their proposals as a result of direct negotiations.
The URL can be used to link to this page
Your browser does not support the video tag.