Laserfiche WebLink
N I E S SWAN <br /> 682 39'".4ve NE Columbia Heights,MN.55421 <br /> Phone(763-780-5191)Fax(763-780-5472) <br /> TO: City of Elk River <br /> Date: 7/28/2017 <br /> FROM: Kyle Higdem Vice-President <br /> Cell Phone (612)-490-81 1 1 <br /> Email: Kyle @swancompanies.net <br /> RE: Project Narrative for <br /> Gas Canopy Expansion to Coborns Superstore <br /> 19425 Evans ST NW, Elk River. MN. <br /> Coborns Inc. Is proposing to add a 24 hour pay at the pump fuel <br /> canopy at this location. The addition of this facility will benefit the ever <br /> growing population of the City of Elk River giving them another convenient <br /> option for fueling their vehicles. <br /> The Canopy will be a standard metal framed structure with steel roof <br /> decking and Painted aluminum decorative fascia. The color will be off white <br /> to match the natural colors of the existing building. It will be 114' long, 24' <br /> wide parallelogram. It will have four dispenser islands with Stainless steel <br /> curbs and protective steel bollards at all corners of the islands. There will be <br /> modern flush mounted led lights under the canopy. Company Logo and fuel <br /> pricing signage would be provided on the fascia per City of Elk River <br /> signage code. Additional permits would be secured at during construction. <br /> We are proposing an automotive Vacuum island adjacent to the fuel canopy <br /> to the west. This would be a small self-serve vacuum station for the <br /> convenience of our customers. We will provide window washing "buckets" <br /> attached to the canopy columns as well as trash receptacles at each island. <br /> The Canopy structure will be located in an existing overflow parking <br /> hard surface area in the South West corner of the lot. This will generate no <br /> additional storm run off for the site. The canopy roof drains will discharge to <br /> the surface at the base of the canopy upright posts. The water will sheet <br /> drain across the parking lot to existing storm structures. <br /> We propose relocating a 12" storm sewer line away from the current <br /> easement. This would consist of rerouting the line to the North of the <br /> Canopy site through a new easement then abandoning the existing easement. <br />