Laserfiche WebLink
Development Standards HILLSIDE CROSSING II <br /> February 19, 1996 <br /> Page Two <br /> high solid cedar wall with a 10 foot green strip with shrubs, trees, and other plantings as shown on <br /> Attachments El and E2. <br /> Another area which will receive high priority in the initial development phase is the retention pond <br /> located in the southeast corner of the plat. This proposed pond will be completed to accept the storm <br /> water from the developed site and will be constructed to accomodate the 100 - year rain level. It will <br /> be retained with sodded 4:1 slopes with clustered shrubs and ornamental trees. <br />