My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCSR AGENDA 03-08-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
03/08/2005
>
PCSR AGENDA 03-08-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 10:54:07 AM
Creation date
3/4/2005 3:22:02 PM
Metadata
Fields
Template:
City Government
type
PCAG
date
3/8/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Industrial Land Development Update <br />February 14,2005 EDA Meeting ~ <br />Page 2 of2 <br /> <br />Request for Proposals <br />Ehlers & Associates have recommended that the EDA utilize an RFP process that insures <br />that the EDA would receive the highest price for the property, development to the highest <br />and best uses and allow the EDA to control the process. The RFP process is a way to <br />market the site immediately to developers and brokers and get their input on concept design <br />prior to improvements. <br /> <br />. <br /> <br />RFP materials were prepared and mailed to 20 developers and brokers earlier this month. <br />The deadline for proposal submissions is March 1. Staff has received a couple of proposal <br />inquiries since the mailing. Ehlers and staff will review the proposals and report the results <br />to the EDA at its March 14 regular meeting. <br /> <br />Concept Plan. Costs and Improvement Schedule <br />Staff has discussed commencing the improvement process for the EDA Brown property in <br />March. Staff has had preliminary discussions regarding fInancing options based on the <br />preliminary concept design and an estimate for improvements, both of which could change <br />depending on proposal concepts. <br /> <br />The City Engineer, Terry Maurer has evaluated the drainage of the area and has <br />recommended that the existing pond, located below the southwest comer of Lot 1, be <br />expanded to handle the drainage for the entire business park. Expanding the existing pond <br />would allow Lot 9 to be used for development rather than as a drainage area. <br /> <br />In July of 2000 the Northstar Corridor Development Association (NCDA) commissioned a <br />station area planning study to evaluate the long range transit-oriented development potential <br />surrounding the proposed depot station sites. The study indicated a concept for commercial <br />offIce/business development and some neighborhood retail surrounding the station for a V4 <br />mile radius. Within a % mile radius the study indicated offIce/business development to the <br />north of the station and low density residential to the east. Another concept indicated low <br />density residential for the majority of 1/4 mile and % mile radius, with the exception of a <br />small neighborhood retail node adjacent to the station. <br /> <br />. <br /> <br />The attached land use map was adopted as part of the city's Comprehensive Plan. The land <br />use map indicates the following uses surrounding the depot station: <br />. High-density residential <br />. Light Industrial <br /> <br />During the Comprehensive Planning process this area was viewed as an important location <br />for both employment and higher density housing. The adopted plan keeps these land uses <br />separate. A concept considered in the process created a new mixed-use land use category for <br />this area. The planning process did not examine transit-oriented in detail, but considered <br />transit as a factor influencing land use. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.