My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 08-16-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
08/16/1999
>
4.4. SR 08-16-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:21 AM
Creation date
3/4/2005 2:06:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />') <br /> <br />. <br /> <br />UNIVERSE OF ALTERNATIVES FOR UPGRADES TO TH tOrrH 47 <br />Northstar Corridor Major Investment Study <br />August 5,1999 <br /> <br />TH 10 I TH 47 SEGMENT <br /> <br />ROADWAY IMPROVEMENT(S) <br /> <br />TH 47 between Hennepin Ave. Bridge <br />and 37th Ave. <br /> <br />No Improvements <br /> <br /> <br />TH 10 between <br />Egret blvd. and TH 169 in Elk River <br /> <br />All.1 Expand existing 4-lane freeway to 6-lane freeway <br />between Egret Blvd. And Thurston Ave. <br />Alt.1 a Expand existing 4-lane expressway to 6-lane expressway <br />from Thurston Ave. to TH 169 in Elk River <br />All.1 b Expand existing 4-lane expressway to 4-lane freeway <br />from Thurston Ave. to TH 169 in Elk River <br /> <br />. <br /> <br />All. 2 Expand existing 4-lane freeway to 6-lane freeway between <br />Egret Blvd. And Round Lake Blvd. <br />No improvements from Round Lake Blvd. to Fairoak Ave. <br />Expand existing 4-lane freeway to 6-lane expressway <br />between Fairoak Ave. and potential river crossing to Dayton <br /> <br /> <br />All. 3 Consolidate access west of Main Street <br />Alt. 4 Coordinate signals <br />Alt. 5 Construct south frontage rd. between 173rd Ave. and Jarvis Street <br />Alt.6 Construct north frontage rd. between 173rd Ave. and Jarvis Street <br /> <br />TH 10 between <br />TH 169 in Elk River and CSAH 14/15 <br /> <br />All. 1 Consolidate access <br /> <br />Alt. 2 Coordinate signals at Joplin and Upland <br />Alt. 3 Construct south frontage rd. between Waco Street and Joplin Street <br />Alt.3a Construct frontage rd between Zebulon and Waco Street <br />Alt. 4 Construct interchange at CSAH 14/15 <br /> <br /> <br />TH 10 between <br />CSAH 14/15 and CSAH 11 <br /> <br />Alt. 1 Construct southern bypass between 200th Street and 162nd Lane <br />Alt. 2 Consolidate access <br />Alt. 3 Construct interchange at 162nd lane <br />Alt.4 Construct south frontage rd between CR 43 and 172nd Street <br />Alt. 5 Construct north backage rd between CR 43 and 172nd Street <br />Alt. 6 Construct interchange at 200th Street <br />All. 7 Grade separate new north-south collector at CR 50 and TH10 <br />All. 8 Construct interchange CSAH 11/TH 10 <br /> <br />. <br /> <br />BRW Inc. <br /> <br />Page1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.