Laserfiche WebLink
Trail Connectivity,as indicated in the master plan,indicates "Other Future Trails" are desired along 165th <br /> Avenue and the northeast side of the BNSF rail line. Staff recommends a 50 foot trail easement be place <br /> along the rail line property line. <br /> Conceptual Greenway,as indicated in the master plan, shows a conceptual greenway through the subject <br /> property. The master plan states,efforts should be made to protect the natural resources that define Elk <br /> River. Now that the property is being developed, this is the time the city can further analyze this desired <br /> greenway. The greenway area (a drainage ditch) on the proposed plat is already protected so no further <br /> activities are needed to maintain this greenway. <br /> In the master plan,the Signature Park Concept Plan for YAC does not show any expansion to south of <br /> the existing fields. It further states reasons why expanding to the north is more desirable. <br /> Financial Impact <br /> None <br /> Attachments <br /> ■ Location Map <br /> ■ Plat Sketch <br /> ■ Fig 5-6 Trail Connectivity <br /> ■ Fig 5-6 Trail Connectivity (partial) <br /> N:\Departments\Parks and Recreation\Commission\Packets\2017\08-09-17 PRC Packet\5.2 sr Final Plat for Parkview Second Addition Park <br /> Dedication.docx <br />