Laserfiche WebLink
These connections could be completed or supplement through the linking of the natural greenway <br /> system. The Priority Conceptual Connection is shown as a north/south connection running through <br /> Sedge Meadow Park (directly adjacent to the subject parcel), connecting into the trials in Highlands Park <br /> East, through Royal Valley Park, and finally connecting into County Road 13 and ending at Main Street. <br /> To accomplish creating another portion of this desired overall connection, staff recommends the Parks <br /> and Recreation Commission recommend the applicant install a 10'wide bituminous trail, centered in a <br /> 20' trial easement,as shown in the exhibit titled"Recommended Trails". The ordinance states park <br /> dedication credit shall not be granted for the construction of recreational facilities unless specifically <br /> approved by the city council. It has not been the practice of the city council to give park dedication <br /> credit for the installation of trails. <br /> Financial Impact <br /> None <br /> Attachments <br /> • Location Map <br /> • Preliminary Plat <br /> • Fig 5-6 Trail Connectivity <br /> • Fig 5-6 Trail Connectivity (partial) <br /> • Recommended Trails <br /> N:\Departments\Parks and Recreation\Commission\Packets\2017\08-09-17 PRC Packet\5.1 sr Trace Heights Second Addition Park <br /> Dedication.docx <br />