My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 08-07-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
08-07-2017
>
8.2. SR 08-07-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2017 1:58:43 PM
Creation date
8/3/2017 1:56:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project:C L k R d w,2I2 <br />Unique#: j d fi- <br />Well Data <br />Engineer <br />Static Water Level (SWL) <br />Drawdown <br />Drilling Date <br />Driller <br />Original Casing Elevation <br />0' <br />1811T W-I'j, al-ilms Date:'71aq2-0 <br />Pump Data <br />Manufacture <br />Installation Date <br />Installer <br />Capacity 17.5- GPM@ 30 TDI i <br />Motor: HP '90 RPM U Oa <br />Volts 4/&4 Phase 3 HZ vlO <br />Well Seal &"k3 <br />Wire <br />SWL <br />5-3 <br />1- r-7— <br />Column <br />3 �I <br />Casing W <br />Check Valve ! 10// <br />todelPWL <br />Bowls <br />Motor' <br />
The URL can be used to link to this page
Your browser does not support the video tag.