Laserfiche WebLink
142 SF <br />MEN'S TOILET <br />177 SF <br />WOMEN'S TOILET <br />160 SF <br />CONCESSIONS145 SF <br />STORAGE <br />722 SF <br />VARSITY CHANGING <br />ROOM <br />397 SF <br />JV CHANGING ROOM <br />96 SF <br />STORAGE <br />215 SF <br />HOME DUGOUT <br />336 SF <br />STORAGE <br />336 SF <br />STORAGE <br />UP <br />UP <br />UP <br />PLAZA <br />471 SF <br />HALL <br />50 SF <br />VESTIBULE <br />CANOPY OVERHANG <br />GRANDSTAND SEATING ABOVE <br />RAMP <br />JLG 15170 - ELK RIVER ACTIVITY CENTER <br />04/12/17 | © 2017 JLG ARCHITECTS <br />SD02 - OPTION 1B - LION'S PARK SOFTBALL IMPROVEMENTS - FLOOR PLAN <br />8 16 320102040 <br />OPTION 1B SUMMARY <br />CONSTRUCTION COSTS <br /> 5,800 S.F. DEMOLITION COSTS <br /> 2,100 S.F. REMODEL SPACE <br /> EXTERIOR IMPROVEMENTS (BUILDING) <br /> SITE AMENITIES <br /> SITE UPGRADES (105 STALLS) <br /> DESIGN CONTIGENCY <br />SUBTOTAL <br />SOFT COSTS <br /> 15% OF CONSTRUCTION <br />SUBTOTAL <br />PROJECT TOTAL <br />$98,600 <br />$130,200 <br />$35,600 <br />$925,000 <br />$244,000 <br />$215,010 <br />$1,648,410 <br />$247,261 <br />$247,261 <br />$1,895,672 <br />PROPOSED PROJECT INCLUDES: <br />- DEMOLISH A PORTION OF EXISTING LION'S PARK CENTER <br />- REMODEL REMAINING LION'S PARK CENTER TO SUPPORT SOFTBALL <br />- CONSTRUCT A PRIMARY 200' COMPETITION SOFTBALL FIELD <br /> - GRANDSTAND SEATING <br /> - CONCRETE BLOCK DUGOUTS <br /> - FIELD LIGHTING <br /> - CONCRETE BLOCK STORAGE BELOW BLEACHER SEATING <br />- CONSTRUCT SECONDARY 200' SOFTBALL FIELD <br />- INCREASE SITE PARKING TO 105 STALLS