My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1999 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1990-1999
>
1999
>
08-09-1999 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:21 AM
Creation date
3/4/2005 1:44:04 PM
Metadata
Fields
Template:
City Government
type
CCM
date
8/9/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council Minutes <br />August 9, 1999 <br />Page 4 <br /> <br />e <br /> <br />2. THAT THE APPLICANT PAY PARK DEDICATION AND SURFACE WATER IMPACT <br />FEES AS REQUIRED BY ORDINANCE; AND <br /> <br />3. DEEDS SHALL BE CROSS-RECORDED FOR THE FOUR ACRES LOCATED IN BIG <br />LAKE TOWNSHIP AND THE SIX ACRES LOCATED IN ELK RIVER TO PREVENT <br />FUTURE SUBDIVISION OF THE PARCELS. <br /> <br />COUNCILMEMBER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />6.2A. Consider Resolution Dedicatina a Trail Easement for Pedestrian Bridae <br /> <br />6.2B. Consider Resolution Reauestina MnDOT APproval of Bid for Pedestrian Bridge <br /> <br />City Engineer Terry Maurer presented these two items to the council. <br /> <br />COUNCILMEMBER FARBER MOVED TO ADOPT RESOLUTION 99-59 REGARDING A <br />TRAIL EASEMENT FOR A PEDESTRIAN PROJECT. COUNCILMEMBER THOMPSON <br />SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />e <br /> <br />COUNCILMEMBER THOMPSON MOVED TO ADOPT RESOLUTION 99-60 AWARDING <br />THE BID FOR THE PEDESTRIAN BRIDGE PROJECT TO REDSTONE CONSTRUCTION IN THE <br />AMOUNT OF $525,513.53. COUNCILMEMBER FARBER SECONDED THE MOTION. THE <br />MOTION CARRIED 5-0. <br /> <br />6.3. <br /> <br />175th Avenue Improvement Proiect Land Acauisition <br /> <br />City Engineer Terry Maurer indicated that staff has been researching the <br />necessary easements and preparation of right-of-way plans for the 175th Avenue <br />improvement project. He indicated that there are approximately 17 easement <br />parcels that need to be acquired for this project located along 175th Avenue <br />from Tyler Street to Filmore Street. <br /> <br />COUNCILMEMBER MOTIN MOVED TO AUTHORIZE STAFF TO ACQUIRE A QUOTE <br />FROM EVERGREEN LAND SERVICES FOR THE ACQUISITION OF THE NECESSARY <br />RIGHT-OF-WAY. COUNCILMEMBER FARBER SECONDED THE MOTION. THE MOTION <br />CARRIED 5-0. <br /> <br />7.1. Reauest to Authorize Bids for Ice Arena Bleachers <br /> <br />Lori Johnson indicated that staff is requesting authorization to go out for bids for <br />the replacement of bleachers at the Barn located in the Ice Arena. <br /> <br />COUNCILMEMBER FARBER MOVED TO AUTHORIZE STAFF TO ADVERTISE FOR BIDS <br />FOR NEW BLEACHERS AT THE BARN IN THE ICE ARENA. COUNCILMEMBER MOTIN <br />SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />7.2. <br /> <br />Consider Authorization to Replace Damaaed Sauad Car <br /> <br />e <br /> <br />Police Chief Zerwas indicated that Assistant Chief Beahen's squad car was <br />damaged in an automobile accident. He requested authorization for <br />replacement of the vehicle. Chief Zerwas presented three bids for replacement <br />vehicles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.