Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Park-and-Ride Lots <br /> <br />New Park-and-Ride Locations <br /> <br />The proposed express bus service would serve eight park-and-ride facilities along the corridor. <br />The assumed locations of the park-and-ride lots correspond to the preliminary commuter rail <br />station locations, which are identified below. Parking at the lots is assumed to be free of charge <br />and below maximum capacity. <br /> <br />. Rice - North of Main Street at BNSF <br />. St. Cloud - TH 10 (2 miles south of St. Cloud) - St. Cloud Visitor Information Center <br />. Clear Lake - TH 10 and 70th Street <br />. Becker - TH 10 and Hancock <br />. Big Lake - TH 25 and Eagle Lake Road <br />. Elk River - TH 10 and Jackson Street <br />. AnokaJRamsey near the Anoka-Hennepin Technical College <br />. Coon Rapids - Foley Boulevard and Coon Rapids Boulevard <br />. Fridley - Starlite and 61st Avenue <br /> <br />The Fridley park-and-ride lot would be served as a separate facility from the Northstar Corridor <br />express service, which would utilize TH 610/252 to 1-94 from the Foley Park-and-Ride. Express <br />service from the Fridley park-and-ride would utilize TH 47 (University Avenue) to downtown <br />Minneapolis. <br /> <br />Enhancements at Existing Park & Ride Lots <br /> <br />Park-and-ride lot design criteria are based on a number of factors including, ease of access in and <br />out of the facility, parking demand, traffic congestion and security issues. Flexibility in design <br />for possible conversion to an alternate mode environment is necessary. Basic amenities for park <br />and ride lots include ample lighting, heat and telephone access. Additional strategies for park- <br />and-ride facility enhancements include: <br /> <br />· Safe linkages for bicycles and pedestrians to the park-and-ride lots, such as improved <br />sidewalks and recreational trails. <br /> <br />. Increased security, including video surveillance, emergency pull box and secured bike <br />storage. <br /> <br />. Communication enhancements using ITS technology such as variable signs displaying wait- <br />time and major delays. <br /> <br />Phase II Northstar Corridor Major Investment Study <br />Draft - TSM Alternative <br /> <br />7 <br /> <br />June 24, 1999 <br />