My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 07-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
07-11-2017
>
5.2 ERMUSR 07-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 4:34:56 PM
Creation date
7/10/2017 2:24:34 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br /> 2017 Utilities Fee Schedule <br /> New Residential Electric Connection-Developer-Lot with ERMU water service $475.00 <br /> New Residential Electric Connection-Developer-Lot without ERMU water service $575.00 <br /> New Residential Electric Connection- Builder $875.00 <br /> New Wire Footages over 200'(per foot) $4.00 <br /> New Service Frost Trenching(per foot) $5.00 <br /> New Commercial&Industrial Electric Connection 50% <br /> Service Upgrades or Additions for Existing Customers 100% <br /> Minimum Temporary Electric Service Fee-Existing Transformer $150.00 <br /> Minimum Temporary Electric Service Fee-Without Existing Transformer $500.00 <br /> Street Light-30'Decorative Pole with 6'Arm and Fixture $1,850.00 <br /> Street Light-23' Decorative Pole with Traditionaire Fixture $1,500.00 <br /> Security Light-Wood Pole with Fixture $975.00 <br /> Security Light-Existing Pole $125.00 <br /> Pole Attachment Fee(per pole) $6.50 <br /> Public Electric Vehicle Charging Fee(per hour/first three hours) $1.00 <br /> Public Electric Vehicle Charging Fee(per hour/after three hours) $2.50 <br /> Water Access Charge=Water Connection Charge+Water Availability Charge $3,528.00 <br /> Water Connection Charge(Per Plumbing Unit)-Builder $3,183.00 <br /> Water Availability Charge(Per Plumbing Unit)-Developer $345.00 <br /> Abandoned Water Service $2,500.00 <br /> Hydrant Water Sales-Rental(per week) $50.00 <br /> Hydrant Water Sales-Units(per 1000 gallons) $4.00 <br /> Deposit for 5/8"Hydrant Meter $150.00 <br /> Deposit for 2 1/2"Hydrant Meter $I,000.00 <br /> Private Hydrant Maintenance Program Monthly Fee $5.00 <br /> ADMINISTRATIVE <br /> Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 <br /> Billable Cost of Materials Markup 1 5% <br /> Billable Labor Markup 55% <br /> Billable Vehicle/Equipment(per employee per hour) $30.00 <br /> Electric Service Disconnect/Trip Fee-Meter Technician $50.00 <br /> Electric Service Disconnect/Trip Fee-Line Crew $150.00 <br /> Energy Audit $150.00 <br /> Meter Tampering Fee $250.00 <br /> Meter Testing Fee $50.00 <br /> NSF Fee $30.00 <br /> Penalty Amount 10% <br /> Photocopies(per page) $0.25 <br /> Red Tag Handling Fee $20.00 <br /> Water Shut-Off Fee $100.00 <br /> Adopted by the Utilities Commission on October 11,2016 under authority per Minnesota Statute 412.361-Amended July 11,2017 <br /> 192 <br />
The URL can be used to link to this page
Your browser does not support the video tag.