My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5 ERMUSR 07-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
07-11-2017
>
2.5 ERMUSR 07-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 2:03:58 PM
Creation date
7/10/2017 2:03:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION <br /> The first step in any water supply analysis is to assess the current status of demand and availability. <br /> Information summarized in Part 1 can be used to develop Emergency Preparedness Procedures (Part 2) <br /> and the Water Conservation Plan (Part 3). This data is also needed to track progress for water efficiency <br /> measures. <br /> A. Analysis of Water Demand <br /> Complete Table 2 showing the past 10 years of water demand data. <br /> • Some of this information may be in your Wellhead Protection Plan. <br /> • If you do not have this information, do your best, call your engineer for assistance or if <br /> necessary leave blank. <br /> If your customer categories are different than the ones listed in Table 2, please describe the differences <br /> below: <br /> 9 <br /> 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.