Laserfiche WebLink
Beaudry Redevelopment TIF District #24 <br />Replacement Cost Report <br />RSMear-is dat3 <br />Square Foot Cost Estimate Report <br />ikw, - t&%_&1%E3Le1W4 <br />Estimate Name: <br />1234 6th Street <br />Footing systems, 10" thick by 20" wide footing <br />City of Elk River <br />1,996.88 <br />1234 6th Street NW, Elk River, Minnesota , <br />8.85 <br />55330 <br />Block wall systems, 8" wall, grouted, full height <br />Economy 1 -1/2 Story with Wood Siding - Wood <br />Building Type: <br />Frame <br />Location: <br />ELK RIVER, MN <br />Story Count: <br />1.5 <br />Story Height (L.F.): <br />8 <br />Floor Area (S.F.): <br />Labor Type: <br />Basement Included: <br />Data Release: <br />Cost Per Square Foot: <br />Building Cost: <br />800 <br />RES <br />No <br />Year 2017 Quarter 2 <br />$160.91 <br />$128,746.99 <br />Date: 5/24/2017 <br />Costs are derived from a building model with basic components. <br />Scope differences and market conditions can cause costs to vary significantly. <br />of Total Cost Per S.F. Cost <br />Footing excavation, building, 26'x 46', 4' deep <br />3.78 <br />3,027.89 <br />Footing systems, 10" thick by 20" wide footing <br />2.5 <br />1,996.88 <br />Block wall systems, 8" wall, grouted, full height <br />8.85 <br />7,079.27 <br />Block wall systems, 8" wall, grouted, full height <br />7.74 <br />6,194.36 <br />Floor slab systems, 4" thick slab <br />2.7 <br />2,160.89 <br />Floor framing systems, 2" x 8 ", 16" OC <br />3.05 <br />2,441.25 <br />Floor framing, wood joists, #2 or better, pine, 2" x 8 ", 16" OC <br />1.23 <br />984.06 <br />Floor framing, bridging, wood 1" x 3 ", joists 16" OC <br />0.25 <br />197.83 <br />Box sills, #2 or better pine, 2" x 8" <br />0.18 <br />146.99 <br />Exterior wall framing systems, 2" x 4 ", 16" OC <br />0.76 <br />606.69 <br />Exterior wall framing systems, 2" x 4 ", 16" OC <br />6.01 <br />4,806.17 <br />Gable end roof framing systems, 2" x 8" rafters, 16" OC, 4/12 pitch <br />6.76 <br />5,409.70 <br />Furring, 1" x 3 ", 16" OC <br />0.76 <br />604.98 <br />Partition framing systems, 2" x 4 ", 16" OC <br />3.74 <br />2,989.44 <br />Wood siding systems, 1/2" x 8" beveled cedar siding, "A" grade <br />1.7 <br />1,360.68 <br />Wood siding systems, 1/2" x 8" beveled cedar siding, "A" grade <br />13.47 <br />10,779.25 <br />Non -rigid insul, batts, fbgls, kraft faced, 3 -1/2" thick, R13, 15" W <br />1.01 <br />809.35 <br />Non -rigid insul, batts, fbgls, kraft faced, 12" thick, R38, 23" wide <br />1.02 <br />814.87 <br />Sliding window systems, builder's quality wood window, 3'x 2' <br />8.87 <br />7,096.91 <br />Door systems, solid core birch, flush, 3' x 6' -8" <br />2.32 <br />1,852.69 <br />Storm door, al, combination, storm & screen, anodized, 3' -0" x 6' -8" <br />0.7 <br />562.51 <br />Beaudry Redevelopment TIF District #24 Replacement Cost Report <br />LHB Project No. 170323 Page 1 of 2 Parcel D, Residence <br />