|
Beaudry Redevelopment TIF District #24
<br />Replacement Cost Report
<br />R r-i5 duta Square Foot Cost Estimate Report
<br />01(w, tbro LJLe%r4
<br />Estimate Name: 634 Quinn Ave NW
<br />City of Elk River
<br />Date: 6/2/2017
<br />Beaudry Redevelopment TIF District #24 Replacement Cost Report
<br />LHB Project No. 170323 Page 1 of 2 Parcel B, Residence
<br />634 Quinn Ave, Elk River, Minnesota , 55330
<br />Economy 1 Story with Wood Siding - Wood
<br />Building Type:
<br />Frame
<br />Location:
<br />MINNEAPOLIS, MN
<br />Story Count:
<br />1
<br />i
<br />' --
<br />-
<br />Story Height (L.F.):
<br />8
<br />_•
<br />Floor Area (S.F.):
<br />930;
<br />--
<br />Labor Type:
<br />RES -=
<br />Basement Included:
<br />No
<br />Data Release:
<br />Year 2017 Quarter Costs are derived from a building model
<br />with basic components.
<br />Cost Per Square Foot:
<br />$126.37 Scope differences and market conditions can cause costs to vary significantly.
<br />Building Cost:
<br />$117,525.95
<br />of Total Cost Per S.F.
<br />Cost
<br />01 Site Work
<br />Footing excavation, building, 26'x 46', 4' deep
<br />3.26
<br />3,027.89
<br />02 Foundation
<br />Footing systems, 10" thick by 20" wide footing
<br />3.09
<br />2,877.19
<br />Block wall systems, 8" wall, grouted, full height
<br />10.97
<br />10,200.14
<br />Floor slab systems, 4" thick slab
<br />4.32
<br />4,019.26
<br />03 Framing
<br />Exterior wall framing systems, 2" x 4 ", 16" OC
<br />4.96
<br />4,616.63
<br />Exterior wall framing systems, 2" x 4 ", 16" OC
<br />0.47
<br />437.4
<br />Truss roof framing systems, 24" OC, 4/12 pitch, 1' overhang, 26' span
<br />7.23
<br />6,719.99
<br />Partition framing systems, 2" x 4 ", 16" OC
<br />3.11
<br />2,896.02
<br />14 Exterior
<br />�
<br />0
<br />Metal & plastic siding systems, vinyl clapboard siding, 8" wide, white
<br />0.63
<br />589.73
<br />Metal & plastic siding systems, vinyl clapboard siding, 8" wide, white
<br />6.69
<br />6,224.45
<br />Non -rigid insul, batts, fbgls, kraft faced, 3 -1/2" thick, R13, 15" W
<br />0.84
<br />777.43
<br />Non -rigid insul, batts, fbgls, kraft faced, 12" thick, R38, 23" wide
<br />1.63
<br />1,515.66
<br />Sliding window systems, builder's quality wood window, 3'x 2'
<br />7.33
<br />6,817.04
<br />Door systems, solid core birch, flush, 3' x 6' -8"
<br />2.99
<br />2,779.03
<br />Storm door, al, combination, storm & screen, anodized, 3' -0" x 6' -8"
<br />0.91
<br />843.77
<br />05 Roofing
<br />� �.
<br />Gable end roofing, asphalt, roof shingles, class A
<br />5.49
<br />5,109.52
<br />0. Interiors
<br />Wall system, 1/2" drywall, taped & finished
<br />9.18
<br />8,533.98
<br />Wall system, 1/2" drywall, taped & finished
<br />3.41
<br />3,173.20
<br />1/2" gypsum wallboard, taped & finished ceilings
<br />2.74
<br />2,546.67
<br />Beaudry Redevelopment TIF District #24 Replacement Cost Report
<br />LHB Project No. 170323 Page 1 of 2 Parcel B, Residence
<br />
|