|
Beaudry Redevelopment TIF District #24
<br />Replacement Cost Report
<br />RS M ea r-i5 duta
<br />Square Foot Cost Estimate Report
<br />Lens , Mv�iW ®L1%r4
<br />02 Foundation
<br />Estimate Name:
<br />633 Proctor Ave NW
<br />Footing systems, 10" thick by 20" wide footing
<br />Mendota Heights
<br />3,087.06
<br />633 Proctor Ave NW, Elk River, Minnesota ,
<br />10.52
<br />55330
<br />Block wall systems, 8" wall, grouted, full height
<br />Economy 1 Story with Wood Siding - Wood
<br />Building Type:
<br />Frame
<br />Location:
<br />MINNEAPOLIS, MN
<br />Story Count:
<br />1
<br />Story Height (L.F.):
<br />8
<br />Floor Area (S.F.):
<br />Labor Type:
<br />Basement Included:
<br />Data Release:
<br />Cost Per Square Foot:
<br />Building Cost:
<br />1040
<br />RES
<br />No
<br />Year 2017 Quarter 2
<br />$139.93
<br />$145,530.89
<br />Date: 5/30/2017
<br />i €III
<br />i
<br />Costs are derived from a building model with basic components.
<br />`Scope differences and market conditions can cause costs to vary significantly.
<br />of Total Cost Per S.F. Cost
<br />Footing excavation, building, 26'x 46', 4' deep
<br />2.91
<br />3,027.89
<br />02 Foundation
<br />Footing systems, 10" thick by 20" wide footing
<br />2.97
<br />3,087.06
<br />Block wall systems, 8" wall, grouted, full height
<br />10.52
<br />10,944.17
<br />Block wall systems, 8" wall, grouted, full height
<br />9.21
<br />9,576.15
<br />Floor slab systems, 4" thick slab
<br />4.32
<br />4,494.65
<br />03 Framing �®
<br />Floor framing, wood joists, #2 or better, pine, 2" x 8 ", 16" OC
<br />1.97
<br />2,046.83
<br />Floor framing, bridging, wood 1" x 3 ", joists 16" OC
<br />0.4
<br />411.48
<br />Box sills, #2 or better pine, 2" x 8"
<br />0.29
<br />305.73
<br />Exterior wall framing systems, 2" x 4 ", 16" OC
<br />4.76
<br />4,953.39
<br />Exterior wall framing systems, 2" x 4 ", 16" OC
<br />0.45
<br />469.31
<br />Truss roof framing systems, 24" OC, 4/12 pitch, 1' overhang, 26' span
<br />7.23
<br />7,514.83
<br />Partition framing systems, 2" x 4 ", 16" OC
<br />2.67
<br />2,775.91
<br />L, Exterior Walls
<br />Wood siding systems, 1/2" x 8" beveled cedar siding, "A" grade
<br />1.01
<br />1,052.55
<br />Wood siding systems, 1/2" x 8" beveled cedar siding, "A" grade
<br />10.68
<br />11,109.42
<br />Non -rigid insul, batts, fbgls, kraft faced, 3 -1/2" thick, R13, 15" W
<br />0.8
<br />834.14
<br />Non -rigid insul, batts, fbgls, kraft faced, 12" thick, R38, 23" wide
<br />1.63
<br />1,694.93
<br />Sliding window systems, builder's quality wood window, 3'x 2'
<br />7.03
<br />7,314.30
<br />Door systems, solid core birch, flush, 3' x 6' -8"
<br />2.67
<br />2,779.03
<br />Storm door, al, combination, storm & screen, anodized, 3' -0" x 6' -8"
<br />0.81
<br />843.77
<br />05 Roofing
<br />Gable end roofing, asphalt, roof shingles, class A
<br />5.49
<br />5,713.87
<br />Beaudry Redevelopment TIF District #24 Replacement Cost Report
<br />LHB Project No. 170323 Page 1 of 2 Parcel J, Residence
<br />
|