Laserfiche WebLink
Beaudry Redevelopment TI District #24 Replacement Cost Report <br />LHB Project No. 170323 Page 2 of 2 Parcel I, Residence <br />Gable end roofing, asphalt, roof shingles, class A <br />2.75 <br />3296.47 <br />0.� <br />Wall system, 1/2" drywall, taped & finished <br />9.18 <br />11011.58 <br />Wall system, 1/2" drywall, taped & finished <br />4.04 <br />4845.10 <br />1/2" gypsum wallboard, taped & finished ceilings <br />2.74 <br />3286.02 <br />Lauan, flush door, hollow core, interior <br />7.85 <br />9422.28 <br />Carpet, Olefin, 15 oz <br />2.11 <br />2528.33 <br />Padding, sponge rubber cushion, minimum <br />0.76 <br />917.75 <br />Underlayment plywood, 1/2" thick <br />2.16 <br />2591.30 <br />Resilient flooring, vinyl sheet goods, backed, .070" thick, minimum <br />1.24 <br />1485.26 <br />Resilient flooring, sleepers, treated, 16" OC, 1" x 3" <br />0.54 <br />646.25 <br />Stairways 14 risers, oak treads, box stairs <br />3.38 <br />4050.41 <br />Basement stairs, open risers <br />0.95 <br />1145.68 <br />07 Specialties <br />Kitchen, economy grade <br />2.31 <br />2771.93 <br />Sinks, stainless steel, single bowl 16" x 20" <br />1.41 <br />1697.03 <br />Water heater, electric, 30 gallon <br />1.26 <br />1509.99 <br />0:� <br />Three fixture bathroom with wall hung lavatory <br />4.09 <br />4911.06 <br />Furnace, gas heating only, 100 MBH, area to 1200 SF <br />0.93 <br />1115.05 <br />Intermittent pilot, 100 MBH furnace <br />0.21 <br />256.72 <br />Supply duct, rectangular, area to 1200 SF, rigid fiberglass <br />0.82 <br />988.53 <br />Return duct, sheet metal galvanized, to 1500 SF <br />1.01 <br />1213.30 <br />Lateral ducts, flexible round 6" insulated, to 1200 SF <br />0.91 <br />1092.20 <br />Register elbows, to 1500 SF <br />0.52 <br />621.16 <br />Floor registers, enameled steel w /damper, to 1500 SF <br />0.33 <br />393.17 <br />Return air grille, area to 1500 SF 12" x 12" <br />0.10 <br />118.02 <br />Thermostat, manual, 1 set back <br />0.11 <br />136.00 <br />Plenum, heating only, 100 MBH <br />0.14 <br />170.31 <br />09 Electrical <br />100 amp electric service <br />1.09 <br />1302.92 <br />Duplex receptacles using non - metallic sheathed cable <br />0.17 <br />206.35 <br />Wiring device systems, economy to 1200 S.F. <br />2.02 <br />2421.58 <br />Light fixture systems, economy to 1200 S.F. <br />0.53 <br />630.18 <br />SubTotal <br />100% <br />$119.89 <br />$143,890.18 <br />Contractor Fees (General <br />Con ditions,Overhead,Profit) <br />10.00% <br />$11.99 <br />$14,389.02 <br />Architectural Fees <br />0.00% <br />$0.00 <br />$0.00 <br />User Fees <br />0.00% <br />$0.00 <br />$0.00 <br />Beaudry Redevelopment TI District #24 Replacement Cost Report <br />LHB Project No. 170323 Page 2 of 2 Parcel I, Residence <br />