Laserfiche WebLink
<br />Roadway Improvements - 1-94 Corridor (St. Cloud to Minneapolis) <br /> <br />Implementation <br />A enc <br />MnlDOT <br />MnlDOT <br />MnlDOT 1 Wright <br />Count <br /> <br />. <br /> <br />Facility or Route <br /> <br />TH25 <br />1-94 <br /> <br />CSAH 75 <br /> <br />Project Description <br /> <br />Construct 100 and ark & ride lot at 1-94 in Monticello <br />Reconstruct westbound ram at CSAH 75 <br /> <br />MnlDOT <br /> <br />TH25 <br /> <br />High school to 1-94 - extend 4 lanes to 1-94 <br />Construct frontage road from 1-94 to CR106 and control <br />access oints <br /> <br />MnlDOT 1 Wright 1-941 CR 18 <br />Count <br /> <br />Widening existing structure for pedestrian walkway <br /> <br />MnlDOT TH 241 <br />MnlDOT 1-94 <br />MnlDOT 1-94 <br />Mn/DOT 1-941 Weaver Lake Rd <br />MnlDOT 1-941 CR 61 <br />MnlDOT 1-94 1 CR 30 <br /> <br /> <br />Source: Transportation Plan Update for the St. Cloud Metropolitan Area 1995-2020; Steams County Transportation Plan; Wright <br />County Transportation Plan; Hennepin County Transportation Systems Plan; Hennepin County Capital Improvement Plan; <br />Metropolitan Development Guide; Minnesota State Transportation Improvement Program (STIP) 1999-2001; Draft State <br />Transportation Improvement Program (STIP) 2000-2002. <br /> <br />. <br /> <br />. <br /> <br />Phase II Northstar Corridor Major Investment Study <br />Draft - No-Build Alternative Summary <br /> <br />6 <br />May 26.1999 <br />