My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2.B. SR 06-19-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
06-19-2017
>
7.2.B. SR 06-19-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 8:08:48 AM
Creation date
6/16/2017 8:06:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approximately 224 sf will be used for office, and there will be approximately 1,600 sf of mezzanine for <br /> storage on the northern quarter of the building. There will be three overhead doors on the west end of <br /> the building, and three on the east. The proposed facility will be a block building, and approximately <br /> 20'-22' high.The new facility is anticipated to generate nearly$11,000 in additional revenue each year <br /> upon project completion, in addition to creating five new jobs averaging$23.20/hr. <br /> Truck Shop owner, Mr. Beaudry, and project team, met with City Engineer Justin Femrite, and County <br /> Engineer, Adam Witter, on January 23, 2017 to discuss future road improvements and the proposed <br /> project. Both indicated their support in moving the project forward through the development process <br /> based on preliminary sketches. <br /> HOURS OF OPERATION <br /> Truck Shop will operate 5 days a week (Monday—Friday), 6am-10pm. <br /> NUMBER OF EMPLOYEES <br /> Truck Shop is a new business and currently has no employees. Mr. Beaudry anticipates creating a total <br /> of five new FTE within two years of project completion, with base hourly wages ranging from $16- <br /> $28/hr. <br /> NUMBER PARKING STALLS <br /> There are a total of four parking stalls (1 handicapped) immediately west of the building, 15 north of the <br /> building and 13 on the east end of the property. In a meeting with staff on 2-17-17, they indicated <br /> parking was adequate based on the proposed use. <br /> PROPOSED SCREENING <br /> Screening will adhere and comply with the city's landscaping ordinance <br /> PROPOSED BUILDING MATERIALS <br /> The building is proposed to be a block or precast building. <br /> SIGNAGE <br /> There is no proposed signage for this facility. <br /> OUTDOOR STORAGE <br /> There will be no outside storage on this site. <br /> PROJECT BENEFITS <br /> • The redevelopment of four, existing non-conforming residential homes; three which are <br /> substandard <br /> • The creation of a minimum of five, full-time permanent jobs for local citizens, with base hourly <br /> wages ranging from $16-$28/hr. <br /> • New jobs provide higher wage levels to the community &will add value to current workforce <br /> skills <br /> • Average hourly wage (w/o benefits) of$23.20/hr; with benefits is$27.20/hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.