|
Lauan,flush door, hollow core, interior 7.14 7,080.99
<br /> Carpet,Olefin, 15 oz 2.11 2,090.09
<br /> Padding,sponge rubber cushion, minimum 0.76 758.67
<br /> Underlayment plywood, 1/2"thick 2.16 2,142.15
<br /> Resilient flooring,vinyl sheet goods, backed, .070"thick, minimum 1.24 1,227.82
<br /> Resilient flooring, sleepers,treated, 16"OC, 1"x 3" 1.08 1,068.47
<br /> 07 Specialties
<br /> Kitchen,economy grade 2.79 2,771.93
<br /> Sinks,stainless steel, single bowl 16"x 20" 1.71 1,697.03
<br /> Water heater,electric,30 gallon 1.52 1,509.99
<br /> 0: Mechanical
<br /> �
<br /> Three fixture bathroom with wall hung lavatory 4.95 4,911.06
<br /> Furnace,gas heating only, 100 MBH,area to 1200 SF 1.12 1,115.05
<br /> Intermittent pilot, 100 MBH furnace 0.26 256.72
<br /> Supply duct, rectangular,area to 1200 SF, rigid fiberglass 0.82 817.18
<br /> Return duct,sheet metal galvanized,to 1500 SF 1.01 1,002.99
<br /> Lateral ducts,flexible round 6" insulated,to 1200 SF 0.91 902.89
<br /> Register elbows,to 1500 SF 0.52 513.49
<br /> Floor registers,enameled steel w/damper,to 1500 SF 0.33 325.02
<br /> Return air grille,area to 1500 SF 12"x 12" 0.1 97.56
<br /> Thermostat, manual, 1 set back 0.14 136
<br /> Plenum, heating only, 100 MBH 0.17 170.31
<br /> 09 Electrical
<br /> 100 amp electric service 1.31 1,302.92
<br /> Wiring device systems, economy to 1200 S.F. 2.02 2,001.84
<br /> Light fixture systems, economy to 1200 S.F. 0.53 520.95
<br /> SubTotal 100% $110.19 $109,310.32
<br /> Contractor Fees(General Conditions,Overhead,Profit) 10.00% $11.02 $10,931.03
<br /> Architectural Fees 0.00% $0.00 $0.00
<br /> User Fees 0.00% $0.00 $0.00
<br /> Total Building Cost ��Me=
<br /> *** Indicates Assemblies or Components have been customized.
<br /> Beaudry Redevelopment TIF District#24 Replacement Cost Report
<br /> LHB Project No. 170323 Page 2 of 2 Parcel C, Residence
<br />
|