My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1a ERMUSR 06-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
06-13-2017
>
6.1a ERMUSR 06-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 10:49:25 AM
Creation date
6/13/2017 10:49:25 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
your Governing Body. There will be two other speaking on the panel with me. The <br /> conference is June 19-21. <br /> • The City held Substance Abuse in the Workplace mandatory training for their managers <br /> and supervisors on June 1. They opened that opportunity up to ERMU managers and <br /> superiors. It was very much appreciated to be included in the training. Separate from the <br /> importance of the topic and the training, these are great opportunities to learn and <br /> develop the City's and ERMU's leadership together. These opportunities strengthen our <br /> relationship and ultimately help us provide our community with a higher level of service. <br /> • Last month over the week of the May Commission meeting I was in San Antonio, TX, <br /> attending the APPA Lineworkers Rodeo and Engineering& Operations Conference. The <br /> ERMU Rodeo Team will be in attendance to speak about the Rodeo and their experience. <br /> In addition to the Rodeo, the E&O Conference was excellent and maybe the best one I've <br /> attended. Topics were highly relevant and timely for ERMU including:pole attachments, <br /> substation construction, workplace safety and incentive programs, and electric vehicle <br /> charging stations. <br /> While I was attending the E&O, I attended the Reliable Public Power Provider(RP3) <br /> Panel meeting. And at the end of this meeting I officially became a member of the Panel; <br /> however, I was allowed to participate in the meeting. Through participation in the panel I <br /> will have exposure to the best practices and procedures of the top 10% of the municipal <br /> utilities in the nation, will have the opportunity to work with 17 of the brightest minds in <br /> public power, and will work directly with the incredible leadership of APPA. This <br /> exposure will have immeasurable value. The nomination and selection process for the <br /> panel is highly competitive typically resulting in applicants applying multiple times <br /> before being selected. I am humbled and honored to have been selected on my first <br /> nomination. This speaks highly of the reputation of ERMU. <br /> ATTACHMENT: <br /> • MMPA Unaudited 1Q2017 Income and Balance Sheet <br /> Page 3 of 3 <br /> 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.