My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 06-14-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
06/14/1999
>
5.2. SR 06-14-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:18 AM
Creation date
2/28/2005 3:50:22 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/14/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />06/0i/99 12:11 <br /> <br />"a'441 i425 <br /> <br />CITY/ELK RIVER <br /> <br />I4J 004 <br /> <br />. <br /> <br />Bid specifications <br />Page 3 Of4 <br /> <br />K. Water Storage <br />A tank made of high-density polyethylene, which has the capability of storing a <br />minimum of 190 gallons of water, shaU be provided to store the ice making water. <br />To store the wash water, a tanlc made from high-density polyethylene that has a <br />minimum capacity of 72 gallons will be available for washing the ice surface. <br /> <br />L. Washing System <br />A wash water pump and squeegee shall be installed on the machine. The operator <br />must be able to wash the ice or remove excess water, as iee surface conditions <br />require. The water pump shall be a self-prime pump. <br /> <br />M. Tires <br />Tires shall be L T 215 85R 16" steel belted radials tires with double shoulder tungsten <br />tip studs for traction or equal. <br /> <br />N. Guide Wheel <br />A roller shall be attached to the left of the machine to protect both machine and <br />boards in the rink corners. The roller shall bc made from a non-marking rubber. <br /> <br />. <br /> <br />O. Board Brush <br />A brush attachment shall be installed on the machine that is capable of brushing <br />away-accumulated snow at the base of the dasher boards. The brush attachment will <br />be hydraulically powered through an electronic control valve. The switch to activate <br />the system will be located on the instrument panel. The brush shall be approximateJy <br />15" in diameter and will rotate only when ex.tended to the operating position. When <br />not in operation, the brush will be capable of being retracted to a position close to the <br />body of the machine and raised above the ice surface. The attachment shall be <br />designed so that the hydraulic cylinder absorbs the shock from the boards during the <br />brushing process. The attachment will have a non marking rubber roller attached to <br />the end of the arm to al;t as a guide while against the boards. <br /> <br />P. AdditionaJ Items To Be Included <br />1) One (1) spear machine tire with rime. <br />2) One (1) hydraulic jack for raising unit. <br />3) One (I) spear shaving blade. <br />4) One (1) set of miscellaneous tools as may be needed for servicing unit. <br />5) One (1) pint of touch up paint (each color). <br />6) One (I) water pump impeller <br />7) One (1) service maintenance manual. <br />8) One (1) Spear key. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.