Laserfiche WebLink
The existing playground equipment is a donation with no value. The cost to the city is the labor costs for <br />parks maintenance staff to assist in the removal of the playground footers; however the donation through <br />a third party will cost less than hauling and disposing of the equipment at the landfill. <br /> <br />Attachments <br /> Resolution authorizing the removal and donation of obsolete playground equipment <br /> Flagship Recreation Proposal <br /> Site Drawing <br /> 3D Image R1 <br /> 3D Image R2 <br />