Laserfiche WebLink
City Council 'Nfinutes Page 4 <br />.,kpill 17, 2017 <br />Moved by Councilmember Wagner and seconded by Councilmember Ovall to <br />continue the public hearing to May 15, 2017. Motion carried 5-0 <br />7.4 Conditional Uls,e Permit: Agricultural Animals, Michael Swanson, <br />213 10 Brooks Road NW <br />Mr. Leeseberg presented the staff report. <br />Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br />Mayor Dietz closed the public hearing. <br />7.5 Conditional Use Permit.- Digital Changeable Copy Sign, Out Front <br />Media, 1805;0 Zane Street NW <br />Mt. Ixesebcrg presented the staff report. <br />Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br />Mayor Dietz closed the public hearing. <br />Moved by Councilmember Westgaard and seconded by Councilmember Ovall <br />to approve the conditional use permit request by Out Front Media, with the <br />following conditions: <br />1. The CUP shall not be recorded until conditions three and four have been <br />satisfied. <br />2. The CUP is not a building permit and all required sign permits must be <br />approved by the building department prior to any construction activities <br />on site. <br />3. Staff approval of the final survey and sign location. <br />4. Staff approval of landscaped plans and specifications outlining <br />compliance with the standards set forth in Sec. 30-871(8). <br />Motion carried 5-0. <br />7.6 Conditional Use Permit: Institutional Use, Spectrum High School, <br />17823 Industrial Circle NW <br />,Mr. Carlton presented the staff report. <br />Mayor Dietz opened the public hearing.'I'llere being no one to speak to this issue, <br />Ma��or Dietz closed the public hearing. <br />Moved by Councilmember Wagner and seconded by Councilmember Olsen <br />to approve the request by Spectrum High School for a conditional use permit <br />with the following conditions: <br />1. The applicant must apply for and receive approval for all required permits <br />before any construction may begin. <br />p 0 X V R I I I I <br />NAWTURE <br />