Laserfiche WebLink
City Council Minutes Page 4 <br />April 17, 2017 <br />----------------------------- <br />Moved by Councilmember Wagner and seconded by Councilmember Ovall to <br />continue the public hearing to May 15, 2017. Motion carried 5-0 <br /> <br />7.4 Conditional Use Permit: Agricultural Animals, Michael Swanson, <br />21310 Brooks Road NW <br /> <br /> Mr. Leeseberg presented the staff report. <br /> <br /> Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br />Mayor Dietz closed the public hearing. <br /> <br />7.5 Conditional Use Permit: Digital Changeable Copy Sign, Out Front <br />Media, 18050 Zane Street NW <br /> <br /> <br />Mr. Leeseberg presented the staff report. <br /> <br /> Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br />Mayor Dietz closed the public hearing. <br /> <br /> Moved by Councilmember Westgaard and seconded by Councilmember Ovall <br />to approve the conditional use permit request by Out Front Media, with the <br />following conditions: <br /> <br />1.The CUP shall not be recorded until conditions three and four have been <br />satisfied. <br /> <br />2.The CUP is not a building permit and all required sign permits must be <br />approved by the building department prior to any construction activities <br />on site. <br /> <br />3.Staff approval of the final survey and sign location. <br /> <br />4.Staff approval of landscaped plans and specifications outlining <br />compliance with the standards set forth in Sec. 30-871(8). <br /> <br />Motion carried 5-0. <br /> <br />7.6 Conditional Use Permit: Institutional Use, Spectrum High School, <br />17823 Industrial Circle NW <br /> <br /> Mr. Carlton presented the staff report. <br /> <br /> Mayor Dietz opened the public hearing. There being no one to speak to this issue, <br />Mayor Dietz closed the public hearing. <br /> <br /> Moved by Councilmember Wagner and seconded by Councilmember Olsen <br />to approve the request by Spectrum High School for a conditional use permit <br />with the following conditions: <br /> <br />1.The applicant must apply for and receive approval for all required permits <br />before any construction may begin. <br /> <br />