My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 04-17-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
04-17-2017
>
4.9. SR 04-17-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:28:40 PM
Creation date
4/13/2017 2:18:40 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Energy efficiency measures installed in or on a building include: <br /> b. Facility systems optimization (commissioning/re-commissioning) <br /> c. Facility systems control improvements <br /> d. Process efficiency improvements (CenterPoint Energy) <br /> e. Lighting efficiency improvements <br /> f. Heating,ventilation and air conditioning system modifications <br /> g. Exterior envelope improvements <br /> h. Motor and pump efficiency improvements <br /> i. Ground-source heat pump systems used to heat or cool a facility <br /> j. Installation of equipment or devices that use renewable energy sources to <br /> generate electricity or heat or cool a building including solar electricity <br /> (photovoltaic),wind turbine or solar thermal. <br /> Ineligible Fund Uses: <br /> a. Inventory <br /> b. Refinancing of existing debt <br /> c. Working capital <br /> d. Expenditures for the construction and/or renovation of residential units <br /> Micro-Brewery Loan <br /> Purpose: The Micro-Brewery microloan is available to business and property <br /> owners in the Downtown Area. The Downtown Area shall be <br /> described as that area in the attached Exhibit A. <br /> Amount: Up to $74,999 of secondary financing not to exceed 20% of the <br /> Total project cost. <br /> Equity: Must have private-sector commitments for 50% of the project cost. <br /> Borrower must provide 10% or more of project financing. <br /> Rate: Fixed at 3%. <br /> Term: Financing with a balloon payment in up to 5-years. Loans may be <br /> amortized up to the following limits: <br /> 10 years on equipment uses <br /> Extension: In the event that the Borrower is unable to obtain conventional <br /> financing to replace the Microloan at the end of five years, the loan <br /> may be extended up to two additional years at a market rate of <br /> interest. <br /> Criteria: At a minimum, 50% of Microloan dollars must be used for the <br /> purchase of equipment. <br /> Loans must be supported by sufficient collateral,which will include <br /> personal guarantees. <br /> Permitted Fund Uses: <br /> P 0 W E R E 0 R r <br /> Page 10 of 21 INAWREI <br />
The URL can be used to link to this page
Your browser does not support the video tag.