My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.b. SWCSR 04-06-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2017
>
04-06-2017
>
3.b. SWCSR 04-06-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 10:06:18 AM
Creation date
4/10/2017 10:06:17 AM
Metadata
Fields
Template:
City Government
type
SWCSR
date
4/6/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"needs assessment." Rather, the Commission (largely Bill Bruce) prepared a 5-year capital plan <br /> which was useful in finalizing negotiations. A franchise and PEG fee audit was also conducted. <br /> Primary concerns were the results of the audit and other franchise compliance problems and <br /> future PEG funding. In the current renewal, concerns would also include the need for HD <br /> capacity, the "free" service and converter box issues, and the continuing potential for <br /> competition. <br /> Conclusion <br /> The Commission will want to consider: <br /> 1) Whether to agree to the informal process at the outset. <br /> 2) How to complete a past-performance and compliance review, and whether to <br /> retain any consultants to, for example, provide a needs assessment. <br /> 3) At minimum, producing another 5 or 10-year PEG capital/equipment plan and <br /> creating a Commission committee for reviewing past performance. The <br /> Commission should also confirm that it will be responsible for conducting any <br /> public hearings to obtain community input and for negotiations. <br /> RJV-254155v1 2 <br /> SH255-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.