My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3 ERMUSR 04-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
04-11-2017
>
2.3 ERMUSR 04-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 4:12:12 PM
Creation date
4/7/2017 4:12:10 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S.P.7102-127(T.H. 10) <br /> MnDOT Agreement Number 1027572 <br /> III. Utility Owner's Ongoing Maintenance Requirements <br /> A. No more than 90 calendar days after receiving as-built plans for the relocation from <br /> the State, the Utility Owner must submit one copy of the State's Application for Utility <br /> Accommodation on Trunk Highway Right of Way, Form 2525 (Permit), including two <br /> copies of"as-built" sketches, for all Facilities within the State's trunk highway right of <br /> way to the Utilities Engineer. <br /> B. Once construction is complete, the Utility Owner must maintain the Facilities at its own <br /> expense. The Utility Owner must follow the terms of the Permit when it performs any <br /> maintenance work. <br /> C. The Utility Owner may open and disturb the trunk highway right of way without a <br /> permit in the case of an emergency that is dangerous to the public and requires <br /> immediate attention. Upon learning of the emergency, the Utility Owner must <br /> immediately notify the State Patrol. The Utility Owner must take all necessary and <br /> reasonable safety measures to protect the public and must cooperate fully with the <br /> State Patrol. In this event, the Utility Owner must request a permit from the proper <br /> authority no later than the working day after it begins working in the right of way. <br /> IV. Payment <br /> A. The State will determine the cost of the relocation on a contract-unit-price basis. The <br /> Utility Owner authorizes the State to pay the Contractor directly for the relocation <br /> work. As Exhibit B shows, the estimated cost of the Utility Owner's relocation work is <br /> $362,961.00. <br /> B. The Utility Owner agrees to pay the State the total cost it incurs to relocate the <br /> Facilities. The total cost will include: <br /> 1. The construction cost, which consists of all of the Contractor's bid item costs to <br /> satisfactorily relocate the Facilities according to the plans, specifications, and <br /> special provisions; and <br /> 2. The construction engineering cost, which is equal to 8 percent of the <br /> construction cost. <br /> C. After acceptance of the bids, the State will notify the Utility Owner of the total cost by <br /> providing a written cost schedule. <br /> Page 4 of 8 <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.