Laserfiche WebLink
S.P. 7102-127 (T.H. 23) <br /> Agreement #1027572 with the Elk River Municipal Utilities <br /> Located on Trunk Highway 10 on Bridge #5955 and Bridge #71005 over <br /> the Elk River (Lake Orono) and from Joplin Street to Xenia Avenue in Elk <br /> River <br /> Exhibit B: Cost Estimate <br /> Estimated Construction Cost: <br /> Estimated cost of water main and sanitary sewer work = $172,912.35 <br /> Construction Engineering Cost: <br /> 8% of estimated water main and sanitary sewer work = $13,832.99 <br /> Total Estimated Bid Cost: <br /> Estimated Contract Cost= $336,075.00 <br /> Construction Engineering Cost = $26,886.00 <br /> Total Estimated Bid Cost of Adjustment = $362,961.00 <br /> TOTAL AGREEMENT COST = $362,961.00 <br /> 61 <br />