Laserfiche WebLink
saved for use, over flow will be drained to a holding area in the southwest corner. <br /> Still waiting for the grading company to return his report to me and I will verify <br /> with the City of EK BEFORE anything is started. <br /> Misc. <br /> The property will also have a 4 to 6 main storm shelter installed. <br /> Single-family residential I would live on site in a tiny home, as a tiny home builder <br /> it is the best way to understand what the clients truly need. It is also part of the <br /> business model to make the business successful. It is one of the main reasons the <br /> area was selected, most of the business/homes along Jasper have homes attached or <br /> detached with businesses on the same lots and under all types of zoning. This part <br /> would be a deal breaker for the purchase of the land and moving forward for this <br /> permit. . <br /> � I a� <br /> i alt <br /> it. <br /> , it: <br /> 4 r <br /> '-1 10 ,,,, <br /> / Bus remodel <br /> • • • ' <br /> • <br /> \ , 41 kk *1 il -_,I iittst <br /> .. k <br /> ,., , <br /> . .,... .. <br /> ..... , _ .... . <br /> .cam . ., <br /> , _ <br /> Bus remodel tiny home <br />