My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 04-03-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
04-03-2017
>
10.1. SR 04-03-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 11:24:59 AM
Creation date
3/31/2017 8:39:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
plumber has 10+ years. The team combined offers a wide range of talents and all <br /> have a passion for the trade and tiny home movement. <br /> Hours of Operations will vary depending on business and needs of the customer. <br /> We will not be following a normal 9 to 5 day work day. We will cater to the client! <br /> As with any contractor, the daily hours will vary — days, evenings and weekends. <br /> All clients appointments will be arranged and scheduled, the entire site will be <br /> fenced in so walk ins really can't happen. We will be respectful to the business <br /> owners and homeowners in our area. <br /> Number of Employees — at first a team of 2 to 4 with others as the business grows. <br /> I will be the only full time person in the beginning, adding the team members as we <br /> can support them financially and with full benefits. <br /> Signage - We plan on one sign in front outside of the fence line —best guess right <br /> now is 8 wide by 5 to 6' tall and no higher than 5 to 6' off the ground — landscaped <br /> underneath with lights for evening. <br /> Parking/Access & outside storage/parking—All parking will be inside the fenced <br /> area — outside storage/parking will be along the east side of the property and <br /> customer parking on the north side of the main pole building, directly in front of the <br /> 24' tiny office trailer. Class V material will be used inside the fenced area for <br /> parking areas, the driveway entrance at the curb line to gate will be blacktop and <br /> the building will have a concrete floor. Sidewalk will be concrete or pavers stone <br /> from the building to office. The current street has a curb and gutter with two <br /> driveway cut a way's, we plan to use the cut a way closest to Jasper, this is about <br /> 35' from the edge of the east side of the property. <br /> Building <br /> A 36 ft. wide by 60 ft. long pole building. The building color scheme will be taupe <br /> sheet metal panels with a blue trim and roof line. The length of the pole building <br /> will run parallel to 162rd street about 80 feet from the curb line. A 24 ft. tiny office <br /> trailer will be used as the office and placed just west of the main pole building. To <br /> the south of the pole building will be three areas for model tiny homes to be parked, <br /> these will change as they are sold and new tiny homes are built. The pole building <br /> will sit on a slab concrete floor. Most work would be done inside the pole barn, but <br /> during good weather conditions (late spring to early fall) we would also build <br /> outside on the south side of the pole barn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.