My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 04-03-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
04-03-2017
>
10.1. SR 04-03-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 11:24:59 AM
Creation date
3/31/2017 8:39:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />(e) Abandonment . <br />(1) If the solar energy system remains nonfunctional or inoperative for more than 12 consecutive <br />months, the system shall constitute a public nuisance. The property owner shall obtain a <br />demolition permit and remove the abandoned system at their expense. Removal includes the <br />entire structure, including collector, mount, and transmission equipment. <br />(f) Conditional uses . <br />(1) Any community solar or solar farm project shall require a conditional use permit. <br />(2) Any solar project exceeding 40 kW shall require a conditional use permit. <br />(3) Any solar project developed over public or semi-public existing infrastructure (i.e. trail, parking <br />lot, sidewalk, pavilion, etc.) shall require a conditional use permit. <br />(Ord. No. 16-08, § 2, 4-18-2016)
The URL can be used to link to this page
Your browser does not support the video tag.