My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 04-03-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
04-03-2017
>
10.1. SR 04-03-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 11:24:59 AM
Creation date
3/31/2017 8:39:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Police As originally submitted in the first narrative with the permit, hours of <br />operations will vary depending on business and needs of the customer. We will not <br />be following a normal 9 to 5 day work day. We will cater to the client! Both us have <br />full time jobs and part of the SBA we have agreed to remained employed, I will be <br />the first to quit after the goal is met and become full time. Hours will be days, <br />nights and weekends, with appointments scheduled to meet times that match our <br />client’s availability. We will be respectful to the business owners and homeowners <br />in our area. <br />Parking/Access As stated in the meeting the parking lot will be class v material, <br />the driveway entrance at from curb line to gate will be blacktop and the building <br />will have a concrete floor. Sidewalk will be concrete or pavers stone from the <br />building to office. <br /> The current street has a curb and gutter with two driveway cut a way’s, we <br />plan to use the cut a way closest to Jasper, this is about 35’ from the edge of the <br />east side of the property. <br /> <br />Stormwater The plan is to collect the rain water for reuse on the site, rain water <br />collection processes will be used and a well at this time is not in the plans or in the <br />near future. A rain purification system with a 5 to 10K holding tank, this is <br />currently being researched. I am not sure if the NPDES permit will be needed and <br />the city will be consulted before any formal plans are made. <br /> <br />Bus and Trailer Maintenance and Repair We do not provide maintenance or repair <br />services, we only refurbish the interior, if we are building a tiny home on a trailer <br />(our main business focus), they will be built on a trailer that we purchase from a <br />trailer manufacturer, in this case we are responsible for the entire project interior <br />and exterior. I have no idea why you would think we will have parts, motor oil, <br />lubricants, etc on site, this has nothing to do with our business plan or model as <br />discussed with Zach and Amanda. We are not a garage or repair shop. The <br />parking/storage would be along the east side of the property as shown on the <br />drawing submitted with the CU permit. See pictures below please to better <br />understand tiny home building and your concept. <br /> Most work would be done inside the pole barn that we will submit a permit <br />request AFTER the CU permit is approved. During good weather conditions (late <br />spring to early fall) we would also build outside on the south side of the pole barn. <br /> <br />Single-family residential I would live on site in a tiny home, as a tiny <br />home builder it is the best way to understand what the clients truly need. <br />It is also part of the business model to make the business successful and
The URL can be used to link to this page
Your browser does not support the video tag.