BID TABULATIONCITY OF ELK RIVER2017 Street ImprovementsER303 bid tabBID TABULATIONBT - 3 OF 14ITEM NO.ITEM DESCRIPTION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION1 MOBILIZATION0.17 LUMP SUM $80,250.82 $13,642.64 $172,401.41 $29,308.24 $12,500.00 $2,125.00 $84,400.00 $14,348.002 REMOVE CURB AND GUTTER 3490.00 LIN FT $3.23 $11,272.70 $2.00 $6,980.00 $2.34 $8,166.60 $3.90 $13,611.003 REMOVE CONCRETE PAVEMENT 1,016 SQ FT $2.61 $2,651.76 $0.50 $508.00 $1.09 $1,107.44 $2.65 $2,692.404 REMOVE CONCRETE WALK 2,468 SQ FT $2.09 $5,158.12 $0.30 $740.40 $1.05 $2,591.40 $2.15 $5,306.205 SAWING CONCRETE PAVEMENT (FULL DEPTH) 84 LIN FT $3.16 $265.44 $4.20 $352.80 $3.55 $298.20 $3.45 $289.806 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 125 LIN FT $1.98 $247.50 $2.30 $287.50 $2.30 $287.50 $2.40 $300.007 SALVAGE SIGN SUPPORT 5 EACH $37.45 $187.25 $57.11 $285.55 $35.90 $179.50 $37.40 $187.008 SALVAGE CASTING 15 EACH $107.00 $1,605.00 $250.00 $3,750.00 $101.22 $1,518.30 $422.00 $6,330.009 SUBGRADE EXCAVATION (EV) 2,167 CU YD $18.54 $40,176.18 $17.50 $37,922.50 $14.77 $32,006.59 $23.50 $50,924.5010 WATER150 MGAL $27.82 $4,173.00 $34.00 $5,100.00 $24.30 $3,645.00 $37.40 $5,610.0011 FULL DEPTH RECLAMATION 21,725 SQ YD $1.21 $26,287.25 $0.50 $10,862.50 $1.20 $26,070.00 $1.75 $38,018.7512 HAUL FULL DEPTH RECLAMATION (LV)7,409 CU YD$6.26$46,380.34$3.70$27,413.30$10.02$74,238.18$6.95$51,492.5513 HAUL FULL DEPTH RECLAMATION (LV)7,024 CU YD$6.25$43,900.00$3.70$25,988.80$11.27$79,160.48$7.20$50,572.8014 MILL BITUMINOUS SURFACE (2")44 SQ YD$9.63$423.72$34.47$1,516.68$2.60$114.40$7.50$330.0015 BITUMINOUS MATERIAL FOR TACK COAT 1,200 GALLON $2.51 $3,012.00 $2.76 $3,312.00 $2.36 $2,832.00 $1.50 $1,800.0016 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) 2,613 TON $45.99 $120,171.87 $58.03 $151,632.39 $11.46 $29,944.98 $58.90 $153,905.7017 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 3,264 TON $41.24 $134,607.36 $52.63 $171,784.32 $45.66 $149,034.24 $48.20 $157,324.8018 ADJUST VALVE BOX 15 EACH $513.54 $7,703.10 $300.00 $4,500.00 $376.20 $5,643.00 $267.00 $4,005.0019 INSTALL CASTING15 EACH $324.48 $4,867.20 $515.00 $7,725.00 $917.36 $13,760.40 $620.00 $9,300.0020 ADJUST FRAME AND RING CASTING 11 EACH $740.22 $8,142.42 $570.00 $6,270.00 $647.55 $7,123.05 $347.00 $3,817.0021 SEAL CATCH BASIN 15 EACH $155.15 $2,327.25 $300.00 $4,500.00 $261.00 $3,915.00 $267.00 $4,005.0022 4" CONCRETE WALK2238 SQ FT $6.37 $14,256.06 $6.85 $15,330.30 $6.55 $14,658.90 $7.00 $15,666.0023 6" CONCRETE WALK 230 SQ FT$7.44$1,711.20$8.00$1,840.00$7.90$1,817.00$8.05$1,851.5024 CONCRETE CURB AND GUTTER DESIGN B618 3490 LIN FT$12.79$44,637.10$14.00$48,860.00$13.70$47,813.00$12.80$44,672.0025 7" CONCRETE DRIVEWAY PAVEMENT 114 SQ YD$77.04 $8,782.56 $83.00 $9,462.00 $77.90 $8,880.60 $82.80 $9,439.2026 8" CONCRETE DRIVEWAY PAVEMENT 40 SQ YD$57.78 $2,311.20 $62.00 $2,480.00 $59.60 $2,384.00 $63.50 $2,540.0027 TRUNCATED DOMES 56 SQ FT $48.15 $2,696.40 $52.00 $2,912.00 $45.70 $2,559.20 $48.10 $2,693.6028 TRAFFIC CONTROL 0.17 LUMP SUM $79,859.18 $13,576.06 $5,688.00 $966.96 $86,000.00 $14,620.00 $88,700.00 $15,079.0029 INSTALL SIGN SUPPORT 5 EACH $80.25 $401.25 $455.04 $2,275.20 $128.00 $640.00 $134.00 $670.0030 STORM DRAIN INLET PROTECTION 17 EACH $90.95 $1,546.15 $265.00 $4,505.00 $122.80 $2,087.60 $96.20 $1,635.4031 STABILIZED CONSTRUCTION ENTRANCE 0.17 LUMP SUM $5,200.29 $884.05 $19,000.00 $3,230.00 $3,900.00 $663.00 $21,400.00 $3,638.0032 FERTILIZER TYPE 1 72 POUND $1.02 $73.44 $2.28 $164.16 $1.05 $75.60 $1.05 $75.6033 COMMON TOPSOIL BORROW (LV) 130 CU YD $34.25 $4,452.50 $25.90 $3,367.00 $30.26 $3,933.80 $37.40 $4,862.0034 SEEDING0.25 ACRE $374.48 $93.62 $568.80 $142.20 $4,120.00 $1,030.00 $4,280.00 $1,070.0035 SEED MIXTURE 25-131 40 POUND $3.20 $128.00 $3.13 $125.20 $2.85 $114.00 $2.95 $118.0036 HYDRAULIC NATURAL TACKIFIER 871 SQ YD $0.75 $653.25 $1.71 $1,489.41 $0.26 $226.46 $0.27 $235.1737 EROSION CONTROL 0.17 LUMP SUM $3,210.00 $545.70 $1,137.59 $193.39 $5,080.00 $863.60 $4,810.00 $817.7038 PAVEMENT MESSAGE EPOXY 192 SQ FT $5.73 $1,100.16 $5.75 $1,104.00 $5.10 $979.20 $5.35 $1,027.2039 4" SOLID LINE EPOXY 5,912 LIN FT $0.31 $1,832.72 $0.30 $1,773.60 $0.27 $1,596.24 $0.29 $1,714.4840 24" SOLID LINE EPOXY 82 LIN FT $6.88 $564.16 $7.00 $574.00 $6.10 $500.20 $6.40 $524.8041 4" BROKEN LINE EPOXY 649 LIN FT $0.31 $201.19 $0.30 $194.70 $0.27 $175.23 $0.29 $188.2142 4" DOUBLE SOLID LINE EPOXY 3,170 LIN FT $0.62 $1,965.40 $0.60 $1,902.00 $0.55 $1,743.50 $0.58 $1,838.6043 CROSSWALK EPOXY 537 SQ FT $3.67 $1,970.79 $3.70 $1,986.90 $3.25 $1,745.25 $3.40 $1,825.80Total Bid Schedule C$581,585.06$605,618.00$552,867.64$686,352.76BID SCHEDULE "C" - S.A.P. 204-131-003 - BUSINESS CENTER DRIVE ORONO ROADVeit & Company, Inc.North Valley, Inc.Park Construction CompanyESTIMATED QUANTITYHardrives, Inc.
|