BID TABULATIONCITY OF ELK RIVER2017 Street ImprovementsER303 bid tabBID TABULATIONBT - 1 OF 14Bids opened Tuesday, March 28, 2017 at 3:00 p.m.There were 7 bids received, as shown herein.ITEM NO.ITEM DESCRIPTION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION1 MOBILIZATION0.13 LUMP SUM $80,250.77 $10,432.60 $45,365.48 $5,897.51 $125,000.00 $16,250.00 $84,390.00 $10,970.702 CLEARING1.00 TREE $1,564.72 $1,564.72 $170.00 $170.00 $1,300.00 $1,300.00 $374.00 $374.003 GRUBBING1 TREE $586.78 $586.78 $170.00 $170.00 $487.00 $487.00 $294.00 $294.004 REMOVE CURB AND GUTTER 4,730 LIN FT $3.23 $15,277.90 $2.00 $9,460.00 $2.21 $10,453.30 $1.90 $8,987.005 REMOVE CONCRETE PAVEMENT 990 SQ FT $2.61 $2,583.90 $0.55 $544.50 $1.56 $1,544.40 $2.65 $2,623.506 REMOVE CONCRETE WALK 750 SQ FT $2.09 $1,567.50 $0.40 $300.00 $1.52 $1,140.00 $2.15 $1,612.507 SAWING CONCRETE PAVEMENT (FULL DEPTH) 90 LIN FT $3.16 $284.40 $4.20 $378.00 $6.15 $553.50 $3.45 $310.508 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 103 LIN FT $1.98 $203.94 $2.35 $242.05 $5.35 $551.05 $2.40 $247.209 SALVAGE CHAIN LINK FENCE 50 LIN FT $16.05 $802.50 $3.45 $172.50 $5.10 $255.00 $5.35 $267.5010 SALVAGE SIGN SUPPORT 3 EACH $26.75 $80.25 $58.00 $174.00 $35.90 $107.70 $37.40 $112.2011 SALVAGE CASTING 13 EACH $110.48 $1,436.24 $250.00 $3,250.00 $101.21 $1,315.73 $422.00 $5,486.0012 SUBGRADE EXCAVATION (EV)160 CU YD$11.73$1,876.80$46.00$7,360.00$14.77$2,363.20$39.60$6,336.0013 WATER100 MGAL$27.82$2,782.00$34.00$3,400.00$24.30$2,430.00$37.40$3,740.0014 FULL DEPTH RECLAMATION 17,388 SQ YD$1.35$23,473.80$0.50$8,694.00$1.20$20,865.60$1.75$30,429.0015 HAUL FULL DEPTH RECLAMATION (LV) 2,801 CU YD $7.14 $19,999.14 $3.70 $10,363.70 $10.02 $28,066.02 $6.95 $19,466.9516 HAUL FULL DEPTH RECLAMATION (LV) 416 CU YD $7.14 $2,970.24 $3.70 $1,539.20 $11.27 $4,688.32 $7.20 $2,995.2017 MILL BITUMINOUS SURFACE (2") 19 SQ YD $26.75 $508.25 $0.85 $16.15 $2.65 $50.35 $7.45 $141.5518 BITUMINOUS MATERIAL FOR TACK COAT 807 GALLON $2.51 $2,025.57 $2.75 $2,219.25 $2.36 $1,904.52 $1.50 $1,210.5019 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 513 TON $50.06 $25,680.78 $68.50 $35,140.50 $58.25 $29,882.25 $56.00 $28,728.0020 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) 1,756 TON $47.02 $82,567.12 $58.00 $101,848.00 $50.67 $88,976.52 $58.30 $102,374.8021 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2,194 TON $41.31 $90,634.14 $53.00 $116,282.00 $45.94 $100,792.36 $48.00 $105,312.0022 15" RC PIPE SEWER DESIGN 3006 CLASS V 103 LIN FT $53.03 $5,462.09 $68.00 $7,004.00 $56.50 $5,819.50 $31.50 $3,244.5023 CONNECT TO EXISTING STORM SEWER 8 EACH$1,988.64$15,909.12$730.00$5,840.00$2,560.00$20,480.00$855.00$6,840.0024 ADJUST VALVE BOX 5 EACH$303.82$1,519.10$300.00$1,500.00$376.17$1,880.85$267.00$1,335.0025 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 6 LIN FT $441.92 $2,651.52 $540.00 $3,240.00 $622.00 $3,732.00 $593.00 $3,558.0026 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 37.9 LIN FT $419.82 $15,911.18 $440.00 $16,676.00 $477.00 $18,078.30 $577.00 $21,868.3027 CASTING ASSEMBLY 10 EACH $524.78 $5,247.80 $520.00 $5,200.00 $917.36 $9,173.60 $620.00 $6,200.0028 ADJUST FRAME AND RING CASTING 17 EACH $740.22 $12,583.74 $570.00 $9,690.00 $596.95 $10,148.15 $347.00 $5,899.0029 SEAL CATCH BASIN 13 EACH $155.15 $2,016.95 $300.00 $3,900.00 $261.00 $3,393.00 $267.00 $3,471.0030 4" CONCRETE WALK 380 SQ FT $6.37 $2,420.60 $6.85 $2,603.00 $7.10 $2,698.00 $7.45 $2,831.0031 6" CONCRETE WALK 705 SQ FT $7.44 $5,245.20 $8.00 $5,640.00 $7.60 $5,358.00 $8.50 $5,992.5032 CONCRETE CURB AND GUTTER DESIGN B618 4,730 LIN FT $12.79 $60,496.70 $13.70 $64,801.00 $13.70 $64,801.00 $12.80 $60,544.0033 8" CONCRETE DRIVEWAY PAVEMENT 177 SQ YD$57.78 $10,227.06 $62.00 $10,974.00 $57.00 $10,089.00 $57.70 $10,212.9034 TRUNCATED DOMES 100 SQ FT $48.15 $4,815.00 $51.70 $5,170.00 $45.70 $4,570.00 $48.10 $4,810.0035 INSTALL SALVAGED FENCE 50 LIN FT $26.75 $1,337.50 $12.50 $625.00 $10.70 $535.00 $10.70 $535.0036 TRAFFIC CONTROL 0.13 LUMP SUM $79,859.23 $10,381.70 $85,000.00 $11,050.00 $86,000.00 $11,180.00 $88,700.00 $11,531.0037 INSTALL SIGN SUPPORT 3 EACH $80.25 $240.75 $260.00 $780.00 $128.00 $384.00 $134.00 $402.0038 STABILIZED CONSTRUCTION EXIT 0.13 LUMP SUM $5,200.23 $676.03 $12,200.00 $1,586.00 $3,900.00 $507.00 $21,400.00 $2,782.0039 FERTILIZER TYPE 1 228 POUND $1.02 $232.56 $1.55 $353.40 $1.05 $239.40 $1.05 $239.4040 COMMON TOPSOIL BORROW (LV) 270 CU YD $32.12 $8,672.40 $26.00 $7,020.00 $30.27 $8,172.90 $26.70 $7,209.0041 SEEDING1.25 ACRE $374.50 $468.13 $9,740.00 $12,175.00 $4,120.00 $5,150.00 $4,280.00 $5,350.0042 SEED MIXTURE 25-131 126 POUND $3.20 $403.20 $4.50 $567.00 $2.85 $359.10 $2.95 $371.7043 HYDRAULIC NATURAL TACKIFIER 2760 SQ YD $0.75 $2,070.00 $1.55 $4,278.00 $0.26 $717.60 $0.27 $745.2044 EROSION CONTROL 0.13 LUMP SUM $3,210.00 $417.30 $1,200.00 $156.00 $5,080.00 $660.40 $4,810.00 $625.3045 PAVEMENT MESSAGE EPOXY 30 SQ FT $5.73 $171.90 $5.80 $174.00 $5.10 $153.00 $5.35 $160.5046 4" SOLID LINE EPOXY 5,535 LIN FT $0.31 $1,715.85 $0.30 $1,660.50 $0.27 $1,494.45 $0.29 $1,605.1547 24" SOLID LINE EPOXY 42 LIN FT $6.88 $288.96 $7.00 $294.00 $6.10 $256.20 $6.40 $268.8048 4" DOUBLE SOLID LINE EPOXY 345 LIN FT $0.62 $213.90 $0.60 $207.00 $0.55 $189.75 $0.58 $200.1049 CROSSWALK EPOXY 432 SQ FT $3.67 $1,585.44 $3.70 $1,598.40 $3.25 $1,404.00 $3.40 $1,468.80Total Bid Schedule A$460,720.25$492,383.66$505,601.02$502,319.25Veit & Company, Inc.North Valley, Inc.ESTIMATED QUANTITYBID SCHEDULE "A" - S.A.P. 204-113-016 - ORONO PARKWAYPark Construction Company Hardrives, Inc.