BID TABULATIONCITY OF ELK RIVER2017 Street ImprovementsER303 bid tabBID TABULATIONBT - 12 OF 14ITEM NO.ITEM DESCRIPTION1 MOBILIZATION0.06 LUMP SUM2 REMOVE CURB AND GUTTER 2160.00 LIN FT3 REMOVE CONCRETE PAVEMENT 1,412 SQ FT4 REMOVE CONCRETE WALK 2,230 SQ FT5 REMOVE BITUMINOUS PAVEMENT 774 SQ YD6 SAWING CONCRETE PAVEMENT (FULL DEPTH) 230 LIN FT7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 360 LIN FT8 SALVAGE SIGN SUPPORT 6 EACH9 SALVAGE CASTING 11 EACH10 MILL BITUMINOUS SURFACE (1.5") 1,544 SQ YD11 MILL BITUMINOUS SURFACE 8,330 SQ YD12 BITUMINOUS MATERIAL FOR TACK COAT 883 GALLON13 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)1,530 TON14 TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING 185 TON15 ADJUST VALVE BOX 5 EACH16 INSTALL CASTING11 EACH17 ADJUST FRAME AND RING CASTING 2 EACH18 SEAL CATCH BASIN 11 EACH19 4" CONCRETE WALK 1,400 SQ FT20 6" CONCRETE WALK 870 SQ FT21 CONCRETE CURB AND GUTTER DESIGN B618 2,160 LIN FT22 7" CONCRETE DRIVEWAY PAVEMENT 157 SQ YD23 TRUNCATED DOMES 294 SQ FT24 TRAFFIC CONTROL 0.06 LUMP SUM25 INSTALL SIGN SUPPORT 6 EACH26 STORM DRAIN INLET PROTECTION 11 EACH27 STABILIZED CONSTRUCTION EXIT 0.06 LUMP SUM28 COMMON TOPSOIL BORROW (LV) 30 CU YD29 SEEDING0.15 ACRE30 SEED MIXTURE 25-131 25 POUND31 HYDRAULIC NATURAL TACKIFIER 533 SQ YD32 EROSION CONTROL 0.06 LUMP SUM33 PAVEMENT MESSAGE EPOXY 71 SQ FT34 4" SOLID LINE EPOXY 240 LIN FT35 24" SOLID LINE EPOXY 70 LIN FT36 4" BROKEN LINE EPOXY 1150 LIN FT37 4" DOUBLE SOLID LINE EPOXY 2,250 LIN FT38 CROSSWALK EPOXY 324 SQ FTTotal Bid Schedule EBID SCHEDULE "E" - S.A.P. 204-154-001 - EVANS STREETESTIMATED QUANTITYUNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION$55,000.00 $3,300.00 $183,000.00 $10,980.00 $12,496.00$749.76$2.50 $5,400.00 $3.75 $8,100.00 $6.61 $14,277.60$2.00 $2,824.00 $2.15 $3,035.80 $1.59 $2,245.08$1.25 $2,787.50 $0.80 $1,784.00 $1.59 $3,545.70$3.50 $2,709.00 $7.15 $5,534.10 $4.77 $3,691.98$3.75 $862.50 $3.76 $864.80 $5.30 $1,219.00$3.00 $1,080.00 $2.50 $900.00 $3.18 $1,144.80$50.00 $300.00 $37.00 $222.00 $47.25 $283.50$150.00 $1,650.00 $140.00 $1,540.00 $334.09 $3,674.99$1.50 $2,316.00 $4.40 $6,793.60 $1.29 $1,991.76$1.75 $14,577.50 $1.10 $9,163.00 $0.52 $4,331.60$3.00 $2,649.00 $4.50 $3,973.50 $1.30 $1,147.90$55.00 $84,150.00 $47.25 $72,292.50 $53.02 $81,120.60$175.00 $32,375.00 $85.00 $15,725.00 $123.53 $22,853.05$350.00 $1,750.00 $368.00 $1,840.00 $347.34 $1,736.70$250.00 $2,750.00 $317.00 $3,487.00 $72.88 $801.68$650.00 $1,300.00 $317.00 $634.00 $696.80 $1,393.60$175.00 $1,925.00 $205.00 $2,255.00 $177.75 $1,955.25$5.88 $8,232.00 $5.70 $7,980.00 $5.62 $7,868.00$12.38 $10,770.60 $12.00 $10,440.00 $11.81 $10,274.70$24.10 $52,056.00 $26.00 $56,160.00 $23.21 $50,133.60$80.00 $12,560.00 $78.00 $12,246.00 $76.65 $12,034.05$46.20 $13,582.80 $45.00 $13,230.00 $44.10 $12,965.40$90,750.00 $5,445.00 $88,600.00 $5,316.00 $269,699.00 $16,181.94$195.00 $1,170.00 $134.00 $804.00 $173.25 $1,039.50$220.00 $2,420.00 $113.00 $1,243.00 $76.46 $841.06$10,000.00 $600.00 $6,500.00 $390.00 $1.00 $0.06$25.00 $750.00 $21.25 $637.50 $16.59 $497.70$440.00 $66.00 $4,500.00 $675.00 $1,483.80 $222.57$3.25 $81.25 $3.15 $78.75 $3.61 $90.25$1.60 $852.80 $0.28 $149.24 $0.60 $319.80$2,750.00 $165.00 $6,300.00 $378.00 $9,015.17 $540.91$5.50 $390.50 $9.29 $659.59 $5.25 $372.75$0.30 $72.00 $0.32 $76.80 $0.28 $67.20$6.60 $462.00 $8.29 $580.30 $6.30 $441.00$0.30 $345.00 $0.32 $368.00 $0.28 $322.00$0.60 $1,350.00 $0.64 $1,440.00 $0.57 $1,282.50$3.52 $1,140.48 $4.73 $1,532.52 $3.36 $1,088.64$277,216.93 $263,509.00 $264,748.18Valley Paving, Inc.C.S. McCrossan Construction, Inc.ASTECH, Inc.
|