Laserfiche WebLink
BID TABULATIONCITY OF ELK RIVER2017 Street ImprovementsER303 bid tabBID TABULATIONBT - 10 OF 14ITEM NO.ITEM DESCRIPTION1 MOBILIZATION0.17 LUMP SUM2 REMOVE CURB AND GUTTER 3490.00 LIN FT3 REMOVE CONCRETE PAVEMENT 1,016 SQ FT4 REMOVE CONCRETE WALK 2,468 SQ FT5 SAWING CONCRETE PAVEMENT (FULL DEPTH) 84 LIN FT6 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 125 LIN FT7 SALVAGE SIGN SUPPORT 5 EACH8 SALVAGE CASTING 15 EACH9 SUBGRADE EXCAVATION (EV) 2,167 CU YD10 WATER150 MGAL11 FULL DEPTH RECLAMATION 21,725 SQ YD12 HAUL FULL DEPTH RECLAMATION (LV)7,409 CU YD13 HAUL FULL DEPTH RECLAMATION (LV)7,024 CU YD14 MILL BITUMINOUS SURFACE (2")44 SQ YD15 BITUMINOUS MATERIAL FOR TACK COAT 1,200 GALLON16 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) 2,613 TON17 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 3,264 TON18 ADJUST VALVE BOX 15 EACH19 INSTALL CASTING15 EACH20 ADJUST FRAME AND RING CASTING 11 EACH21 SEAL CATCH BASIN 15 EACH22 4" CONCRETE WALK 2238 SQ FT23 6" CONCRETE WALK 230 SQ FT24 CONCRETE CURB AND GUTTER DESIGN B618 3490 LIN FT25 7" CONCRETE DRIVEWAY PAVEMENT 114 SQ YD26 8" CONCRETE DRIVEWAY PAVEMENT 40 SQ YD27 TRUNCATED DOMES 56 SQ FT28 TRAFFIC CONTROL 0.17 LUMP SUM29 INSTALL SIGN SUPPORT 5 EACH30 STORM DRAIN INLET PROTECTION 17 EACH31 STABILIZED CONSTRUCTION ENTRANCE 0.17 LUMP SUM32 FERTILIZER TYPE 1 72 POUND33 COMMON TOPSOIL BORROW (LV) 130 CU YD34 SEEDING0.25 ACRE35 SEED MIXTURE 25-131 40 POUND36 HYDRAULIC NATURAL TACKIFIER 871 SQ YD37 EROSION CONTROL 0.17 LUMP SUM38 PAVEMENT MESSAGE EPOXY 192 SQ FT39 4" SOLID LINE EPOXY 5,912 LIN FT40 24" SOLID LINE EPOXY 82 LIN FT41 4" BROKEN LINE EPOXY 649 LIN FT42 4" DOUBLE SOLID LINE EPOXY 3,170 LIN FT43 CROSSWALK EPOXY 537 SQ FTTotal Bid Schedule CBID SCHEDULE "C" - S.A.P. 204-131-003 - BUSINESS CENTER DRIVE ORONO ROADESTIMATED QUANTITYUNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION$55,000.00 $9,350.00 $183,000.00 $31,110.00 $12,496.06$2,124.33$2.50 $8,725.00 $2.95 $10,295.50 $3.18 $11,098.20$1.75 $1,778.00 $0.85 $863.60 $1.59 $1,615.44$1.00 $2,468.00 $1.20 $2,961.60 $1.59 $3,924.12$3.75 $315.00 $3.76 $315.84 $5.30 $445.20$3.00 $375.00 $2.50 $312.50 $3.18 $397.50$50.00 $250.00 $37.00 $185.00 $47.25 $236.25$150.00 $2,250.00 $140.00 $2,100.00 $334.09 $5,011.35$18.50 $40,089.50 $14.65 $31,746.55 $20.88 $45,246.96$3.00 $450.00 $34.00 $5,100.00 $22.75 $3,412.50$1.15 $24,983.75 $1.69 $36,715.25 $2.50 $54,312.50$7.75 $57,419.75 $10.75 $79,646.75 $10.33 $76,534.97$14.50 $101,848.00 $12.00 $84,288.00 $7.28 $51,134.72$15.00 $660.00 $45.00 $1,980.00 $23.91 $1,052.04$3.00 $3,600.00 $4.62 $5,544.00 $1.30 $1,560.00$50.98 $133,210.74 $53.25 $139,142.25 $50.29 $131,407.77$45.18 $147,467.52 $43.10 $140,678.40 $43.98 $143,550.72$350.00 $5,250.00 $368.00 $5,520.00 $359.56 $5,393.40$750.00 $11,250.00 $317.00 $4,755.00 $72.88 $1,093.20$650.00 $7,150.00 $317.00 $3,487.00 $788.39 $8,672.29$175.00 $2,625.00 $205.00 $3,075.00 $177.75 $2,666.25$5.88 $13,159.44 $5.70 $12,756.60 $5.62 $12,577.56$12.38 $2,847.40 $12.00 $2,760.00 $11.81 $2,716.30$13.15 $45,893.50 $15.00 $52,350.00 $12.55 $43,799.50$80.30 $9,154.20 $78.00 $8,892.00 $76.65 $8,738.10$79.64 $3,185.60 $77.25 $3,090.00 $76.02 $3,040.80$46.20 $2,587.20 $45.00 $2,520.00 $44.10 $2,469.60$90,750.00 $15,427.50 $88,600.00 $15,062.00 $269,700.00 $45,849.00$50.00 $250.00 $134.00 $670.00 $173.25 $866.25$220.00 $3,740.00 $133.00 $2,261.00 $76.46 $1,299.82$10,000.00 $1,700.00 $6,500.00 $1,105.00 $1.00 $0.17$0.77 $55.44 $1.15 $82.80 $1.42 $102.24$25.00 $3,250.00 $21.25 $2,762.50 $32.00 $4,160.00$440.00 $110.00 $4,500.00 $1,125.00 $1,483.76 $370.94$3.16 $126.40 $3.15 $126.00 $3.61 $144.40$1.60 $1,393.60 $0.28 $243.88 $0.60 $522.60$550.00 $93.50 $6,300.00 $1,071.00 $3,181.87 $540.92$5.50 $1,056.00 $9.29 $1,783.68 $5.25 $1,008.00$0.30 $1,773.60 $0.32 $1,891.84 $0.28 $1,655.36$6.60 $541.20 $8.29 $679.78 $6.30 $516.60$0.30 $194.70 $0.32 $207.68 $0.28 $181.72$0.59 $1,870.30 $0.64 $2,028.80 $0.57 $1,806.90$3.52 $1,890.24 $4.73 $2,540.01 $3.36 $1,804.32$671,815.08 $705,831.81 $685,060.81Valley Paving, Inc.C.S. McCrossan Construction, Inc.ASTECH, Inc.