<br />notified by the Railway that plans have been approved. The Contractor will be <br />required to use lifting devices such as, cranes and/or winches to place or to remove <br />any falsework over Railway's tracks. In no case will the Contractor be relieved of <br />responsibility for results obtained by the implementation of said approved plans. <br /> <br /> 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with <br />the Contractor such that the work may be handled and performed in an efficient <br />manner. The Contractor will have no claim whatsoever for any type of damages or <br />for extra or additional compensation in the event his work is delayed by the Railway. <br /> <br /> <br />1.02 Contractor Safety Orientation <br /> <br /> 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees <br />may enter Railway Property without first having completed Railway’s <br />Engineering Contractor Safety Orientation, found on the web site <br />www.BNSFContractor.com. The Contractor must ensure that each of its <br />employees, subcontractors, agents or invitees completes Railway’s <br />Engineering Contractor Safety Orientation through internet sessions before <br />any work is performed on the Project. Additionally, the Contractor must <br />ensure that each and every one of its employees, subcontractors, agents or <br />invitees possesses a card certifying completion of the Railway Contractor <br />Safety Orientation before entering Railway Property. The Contractor is <br />responsible for the cost of the Railway Contractor Safety Orientation. The <br />Contractor must renew the Railway Contractor Safety Orientation annually. <br />Further clarification can be found on the web site or from the Railway’s <br />Representative. <br /> <br /> <br />1.03 Railway Requirements <br /> <br /> 1.03.01 The Contractor must take protective measures as are necessary to keep <br />railway facilities, including track ballast, free of sand, debris, and other foreign <br />objects and materials resulting from his operations. Any damage to railway facilities <br />resulting from Contractor's operations will be repaired or replaced by Railway and <br />the cost of such repairs or replacement must be paid for by the Agency. <br /> <br /> 1.03.02 The Contractor must notify the Railway's Division Engineer <br />________________________ at (_____)_________________ and provide blasting <br />plans to the Railway for review seven (7) calendar days prior to conducting any <br />blasting operations adjacent to or on Railway's Property. <br /> <br /> 1.03.03 The Contractor must abide by the following temporary clearances during <br />construction: <br /> <br /> 15’-0” Horizontally from centerline of nearest track