Laserfiche WebLink
<br />timetable speeds. <br /> <br /> 1.05.02d When any hazard is presented to Railway track, communications, <br />signal, electrical, or other facilities either due to persons, material, <br />equipment or blasting in the vicinity. <br /> <br /> 1.05.02e Special permission must be obtained from the Railway before moving <br />heavy or cumbersome objects or equipment which might result in <br />making the track impassable. <br /> <br /> 1.05.03 Flagging services will be performed by qualified Railway flaggers. <br /> <br /> 1.05.03a Flagging crew generally consists of one employee. However, <br />additional personnel may be required to protect Railway Property and <br />operations, if deemed necessary by the Railways Representative. <br /> <br /> 1.05.03b Each time a flagger is called, the minimum period for billing will be the <br />eight (8) hour basic day. <br /> <br /> 1.05.03c The cost of flagger services provided by the Railway will be borne by <br />(Agency). The estimated cost for one (1) flagger is approximately <br />between $800.00-$1,600.00 for an eight (8) hour basic day with time <br />and one-half or double time for overtime, rest days and holidays. The <br />estimated cost for each flagger includes vacation allowance, paid <br />holidays, Railway and unemployment insurance, public liability and <br />property damage insurance, health and welfare benefits, vehicle, <br />transportation, meals, lodging, radio, equipment, supervision and other <br />costs incidental to performing flagging services. Negotiations for <br />Railway labor or collective bargaining agreements and rate changes <br />authorized by appropriate Federal authorities may increase actual or <br />estimated flagging rates. THE FLAGGING RATE IN EFFECT AT THE <br />TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER <br />WILL BE USED TO CALCULATE THE ACTUAL COSTS OF <br />FLAGGING PURSUANT TO THIS PARAGRAPH. <br /> <br /> 1.05.03d The average train traffic on this route is ______ freight trains per <br />24-hour period at a timetable speed ______ MPH and ______ <br />passenger trains at a timetable speed of ______ MPH. <br /> <br /> <br />1.06 Contractor General Safety Requirements <br /> <br /> 1.06.01 Work in the proximity of railway track(s) is potentially hazardous where <br />movement of trains and equipment can occur at any time and in any direction. All <br />work performed by contractors within 25 feet of any track must be in compliance with <br />FRA Roadway Worker Protection Regulations.