Laserfiche WebLink
Planning Commission Minutes Page 4 <br />January 24, 2017 <br /> <br />Moved by Commission Konietzko and seconded by Commissioner Thiel <br />recommend approval of a zone change to Mineral Extraction Overla <br />103-1300 and 75-103-1400. Motion carried 7-0. <br /> <br />Moved by Commissioner Konietzko and seconded by Commissioner Nic <br />recommend approval of Conditional Use Permit, Case No. CU 17-02 with the <br />following conditions: <br />1.If the proposed work described in the application and Conditional Use Permit has <br />not been substantially completed within two years of the Conditional Use Permits <br />date of approval, the permit shall expire and become void. <br />2.The Conditional Use Permit shall expire if the authorized use ceases for more than <br />six months. Failure to obtain an annual license will be evidence of cessation of <br />use. <br />3.The applicant must apply for and receive approval of all required permits before <br />any construction may begin. <br />4.A mineral extraction license shall be obtained annually. <br />5.Setbacks of 50 feet from Baldwin Ave and the northern property line shall be <br />maintained. Setbacks of 30 feet from US Hwy 169 shall be maintained. Setback of <br />30 feet from the southern property line, unless mining collaboration agreement <br />across property lines is confirmed. No mining activity shall be permitted within <br />the setback area without staff approval. <br />6.The need of buffering and/or screening in light of surrounding land uses shall be <br />evaluated at the time of annual license renewal and shall be installed when <br />directed by the City to protect surrounding land uses. <br />7.The applicant shall be responsible for the cost and construction of necessary and <br />reasonable road improvements related to the project, as deemed necessary by the <br />City, Sherburne County or MnDot. The City reserves the right to require the <br />applicant to pay for road maintenance of haul routes. <br />8.The applicant shall work with the City Engineer to locate the berming along <br />Baldwin Street NW. <br />9.Wash operations shall not be permitted unless a plan for protecting ground water <br />and surrounding environment is approved by the cityÔs environmental consultant. <br />10.Dust control is required for all roads and within the site in accordance with air <br />pollution standards and to ensure dust does not create a public nuisance or <br />otherwise adversely affecting adjacent properties. <br />11.All activities on the site shall be conducted in a manner that is consistent with <br />operating permits issued by the City, county, state, federal and other agencies. A <br />copy of any and all permits related to the operation of the site shall be submitted to <br />the City for their reference. <br />12.Vehicles and equipment not in operable condition or materials not associated with <br />the mineral extraction/excavation activity shall not be kept or stored at the site. <br />13.The site shall be mowed or maintained to control noxious weeds and other <br />vegetation. Existing trees and ground cover shall be preserved to the maximum <br />extent possible. <br /> <br />