Laserfiche WebLink
<br />02-15-2005 04:58PM <br /> <br /> <br />+ <br /> <br />T-827 P.002/005 F-293 <br /> <br />VEIT ENVIRONMENTAL, INC. <br /> <br />23801 Industrial Blvd., Suite 100 . Rogers, MN 55374 . Phone 763.428.2819' Fax 763.428.3574 . www.veitcompanies.com <br /> <br />l.:~-r. ,~:t1 <br /> <br />Asbestos <br />& Lead <br />Abatement <br /> <br />PROPOSAL AND AGREEMENT <br /> <br />Microbial <br />Remediation <br /> <br />Indoor <br />Air Quality <br />51lrlrices <br /> <br />PROPOSAL SUBMITTED TO: Mr. Terry Maurer <br />Howard R. Green Company <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br /> <br />Duct Cleaning <br /> <br />RE: <br /> <br />Abestos Budget and Demolition Budget <br />Elk River Municipalities Building <br />322 King Avenue <br />Elk River, MN <br /> <br />Infection. <br />. 'Control <br /> <br />NVe hereby submit this lump sum eStimate proposal for the work descno~d below: <br /> <br /> <br />. .." ,.'00: "." <br />.. :.'" ":' :'~"'.' ::. A.sbestos Abatement $ 6.965.00 <br />;: ,. .\.' ;::':~:'::'. .~~. .:;~::Our proposal is based upon removing approx. 210 sf of asbestos sheet flooring, 250 sf of asbestos floor tile, 350 sf <br />. ":. .':.::.'~ ~ '.::'.; .;.; ::,..:~:.:,ofasbcstos mastic, 1120 sf of paneling adhesive, and 36 lineal feet ofasbcstos caulking. Work areas consist of <br />:../~)~~:~~.{~~~~~;,::~:r-temoving materials from the front offices, east offices, and the exterior of me building. <br /> <br />.,';~'(/~;MIg;~:~tZ~~~t.ead Based Paint Abatement . $ No Bid ReQ'd <br />~::::j~~::Wf;;ff.:~~:5~j]Upon ~~er review o~ L?c lead b~sed paint swvey, V cit has ,detcrmined ~at since all lead paint identified in The <br />:'~: ,:.;=:~:.-='.t;f-.;~~;~~~~'?;' ~.,:survey 1$ In good conditIOn, no paInt needs to be removed pnor to demolinon. <br />1~i;::t~~~~~~~f;~~ <br />"';:~":::7rrt~~~;:;;:~~~ther Hu.ardous Waste $ 875.00 <br />i.t~;~21~~~?'.:l\;"~."':~~Our proposal includes standard hazardous waste materials to be removed such as fluorescent bulbs, PCB ballastS, <br />~~~~.. . ercUI)' switches, door closures, exit lamps, ceiling fans, security panels, water heaters, furnace, overhead door <br />~~;!.. peners, hanging heater, air conditioning unit, and wood antenna pole as neccssary to remove hazardous <br />omponcnts - No chemical wastcs. (Excludes tank removal, well abandonment, resting, and removal of personal <br />roperlY). <br /> <br />11 work to be done in compliance with ~tate and Federal rules and rcgulations. Veil's estimate is based upon the <br />nfomlation provided in the "AsbcstosILcad-Bascd PainrIHazardous Materials Building Material Inspection <br />eporr" as prepared by Liesch Companies, dated Ocrober 2004, <br /> <br />Work To Include: <br />All Labor, Materials, Equipment, Insurance, and Disposal. <br /> <br />Work To Exclude: <br />Moving of all items from the work areas prior to asbeSTOS removal. <br />Replacemem of materials. <br /> <br /> <br />. BO~~ <br />S;gn.lUr" ~ /'~_ <br />cot! 0 <br /> <br />Date: 211 5105 <br /> <br />Division Managcr <br /> <br />ooB,'sT S,'rv;c(' in Ih(' B[/~'in('.\'S" <br />