Laserfiche WebLink
<br />Civil Engineering <br />Land Surveying <br />Land Planning <br /> <br />John Oliver &- Associates, IncfEB 152005 <br /> <br />580 Dodge Avenue, Elk River, MN 55330 <br />(763) 441-2072 . Fax (763) 441-5665 <br />eriver@joIiverassoc.com <br /> <br /> <br />February 15,2005 <br /> <br />Ms. Michele McPherson <br />Director of Planning <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />Re: Proposal for Professional Services <br />Elk River Public Works Facility - Elk River, Minnesota <br /> <br />Dear Ms. McPherson: <br /> <br />John Oliver & Associates, Inc. would like to thank you for the opportunity to submit this proposal for Professional <br />Services involved with the master grading plan design for construction of the City's Public Works site. <br /> <br />Based upon the request for proposal and our discussions, we understand the scope of services will involve providing <br />the final grading plan necessary for construction by March 25, 2005. <br /> <br />City Provided Services in Electronic Format: <br />Boundary Survey <br />Concept Site Information (Layout Provided with Proposal) <br />Topography Information <br />Wetland Delineation Information <br /> <br />The estimated total cost of our services is summarized below: <br /> <br />Scope of Services: <br />Site Information Services: <br />Geotechnical Report, Staking, Coordination & Mapping of <br />Soil Borings (Assumes 4 Borings) <br />Wetland Report, Mitigation Plan & TEP Review <br />Subtotal <br /> <br />Cost <br /> <br />Not to Exceed <br /> <br />$ 4,000 Lump Sum <br />$ 4.500 Lump Sum <br />$ 8,000 <br /> <br />$ 4,000 <br />$ 4,500 <br /> <br />Basic Services: <br />Final Grading, Erosion Control, Utility & Drainage Plan <br />Construction Details, Specifications & Quantity Estimates <br />Drainage Calculations, NPDES Application & SWPPP <br />Meetings (Attend as Needed or Requested) <br /> <br />Subtotal <br />Total <br /> <br />$ 3,000 Lump Sum <br />$ 2,000 Lump Sum <br />$ 1,400 Lump Sum <br />$ 720 Hourly <br />$ 7,120 <br />$15,620 <br /> <br />$ 3,000 <br />$ 2,000 <br />$ 1,400 <br />$ 720 <br /> <br />$15,620 <br /> <br /> <br /> <br />