My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.9. SR 02-22-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/22/2005
>
5.9. SR 02-22-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:14 AM
Creation date
2/18/2005 9:52:49 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />February 4, 2005 <br /> <br />Dan Nichols <br />Schoell & Madson - <br />554 Third Street <br />Suite 100 <br />Elk River, MN 55330 <br /> <br />RE: Request for Proposal- Master Grading Plan for Elk River Public Works Facility <br /> <br />Dear Mr. Nichols: <br /> <br />The City of Elk River is requesting proposals for professional services to prepare a master <br />grading plan for the City's Public Works Site. Enclosed please fInd two exhibits depicting <br />existing and fInal conditions. <br /> <br />Your proposal must include, but is not limited to the following services: <br /> <br />1. Preparation of a grading plan including earthwork calculations, erosion control plan, <br />details and specifIcations. The grading plan should include all information necessary <br />for bidding the improvements. <br />2. Preparation of drainage calculations and drainage report. This should include the <br />following: <br />a. Determination of all areas tributary to the site. <br />b. 100-year pre and post development runoff calculations. <br />c. 10 year post development runoff calculation. <br />d. Storm sewer design for 10-year, 24-hour storm. <br />e. Pond sizing for quality control using Best Management Practices and rate <br />control of a 100-year, 24-hour storm. <br />f. Design in compliance with City standards and NPDES requirements. <br />3. Coordination and acquisition of appropriate soil borings as needed. <br />4. Preparation of a wetland report, wetland impact and mitigation plans, and <br />coordination of their review by the Technical Evaluation Panel. <br />5. Preparation of a site plan, details, and specifIcations. The site plan should include all <br />information necessary for bidding the improvements. <br />6. Preparation of a utility plan, details and specifIcations. The utility plan should <br />include all information necessary for bidding the improvements. <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br /> <br />www.cLelk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.