Laserfiche WebLink
<br />II. Final Plans, Specifications and Contract Documents for Bidding Purposes <br /> <br />1. Site, Grading, Drainage, Erosion Control and Utility Plans and Specifications <br /> <br />A. Prepare and submit final project plans and specifications and an engineer's opinion of <br />probable cost to the City staff for review and comment. Specifications shall include the <br />applicable; bidding documents, general conditions, special conditions and technical <br />specifications. <br /> <br />B. Make necessary revisions to the plans, specifications and engineers opinion of probable <br />cost, based on the City Engineer review. <br /> <br />2. Permits <br /> <br />A. Submit permit applications as required, including: <br /> <br />1. Wetland Impact and Mitigation application to the local governing unit (by Polaris <br />Group); <br /> <br />2. NPDES (grading and erosion control) permit application to MPCA and update the <br />City's General Stormwater Pollution Prevention Plan to fit the site as part of the <br />permit application. <br /> <br />WORK EFFORT AND COST <br /> <br />Based on our understanding of your project, we have prepared the following not to exceed cost estimate. <br />As requested, the estimate is divided by tasks, and includes staff positions and their hourly rate. <br /> <br />1. Preliminary Study and Preliminary Design <br /> <br />Hours <br /> <br />Staff <br /> <br />24 <br />24 <br />4 <br /> <br />Engineer <br />Technician <br />Clerical <br />Total <br /> <br />2. Geotechnical Evaluations <br /> <br />Rate <br /> <br />$100/hr <br />$65/hr <br />$48/hr <br /> <br />Northern Technologies Total <br />4 Survey $ 120/hr <br /> <br />3. Prepare Preliminary Plans <br /> <br />40 <br />50 <br />4 <br /> <br />Engineer <br />Technician <br />Clerical <br />Total <br /> <br />4. Wetland Mitigation Report, <br />permit application, coordination <br />and TEP panel meetings. <br /> <br />Polaris Group Total <br />12 Engineer <br />8 Technician <br />Total <br /> <br />City of Elk River - Page 3 <br /> <br />$100/hr <br />$65/hr <br />$48/hr <br /> <br />$100/hr <br />$65/hr <br /> <br />Amount <br /> <br />$2,400 <br />$1,560 <br />$192 <br />$4,152 <br /> <br />$2,200 <br />$480 <br /> <br />$2,400 <br />$3,250 <br />$192 <br />$5,842 <br /> <br />$4,400 <br />$1,200 <br />$520 <br />$6,120 <br />III Hakanson <br />Anderson <br />1 Assoc., Inc. <br />