Laserfiche WebLink
<br />p.m. peak hour. With the proposed development, the northbound and the southbound left turns <br />and the through movements will op~rate at LOS F. This situation is not uncommon,<especially. <br />for left turns and through movements on a minor street approach with stop sign control at a <br />high-volume roadway. Altliough traffic signal control could provide better openitionsat this <br />intersection, this mitigation was not examined given the close 'spacing of less than 400 feet . <br />between Carson Street and TH 169. <br /> <br />In addition to the capacity analyses, we simulated trafficconditions-forthe 2006 build <br />condition using the Simtraffic 6 software package. One ofthe results that the simulation <br />generates is queues for various movements. Our simulation resulted in queuing atboth the <br />subject interseCtions for the 2006 build condition during both the a.m. and the p.m. peak hours. <br />These results clearly indicate that the p.m. peak hour is the most critical period for queuing. <br />The industry practice is to design for the 95th percentile queues. The p;m. peak hour 95th <br />percentile queue for the eastbound movements at the TH 169/Main Street inten;ection is about <br />276 feet, which principally is caused. by through movements. The 95th percentile queuing for <br />the westbound movements at the Main Street/Carson Street intersection is about 74 feet, which <br />principally is caused" by the left turns. These 95th percentile queues are within the available <br />stacking space of about 320 feet on Main Street between Carson Street and TH 169. <br /> <br />Our overall conclusion from the capacity analyses and simulation is that the proposed <br />development will have minimal impacts on the TH 169/Main Street intersection and on Main <br />Street at Carson Street. We acknowledge that the proposed access plan is not ideal and results. <br />in individual movements operating ar poor levels of service. However, given the location of <br />this property and the access constraints that exist, the proposed access location is the best <br />possible solution. <br /> <br />. <br />Although other measures such as channelizing islands can be used to improve existing and <br />future LOS E and F operations at the TH 169IMain Street intersection, we understand that < <br />Mn/DOTis not planning on any changes at this intersection. Instead, discussions are <br />underway regarding upgrading TH 169 to a freeway in the future to accommodate the already <br />high traffic volumes. Considering findings from our analyses and MniDOT's plans for the <br />future, we do not recommend any changes to Main Street or TH 169 to accommodate the <br />. projected 2006 build traffic as the proposed development would not cause any significant <br />changes in the 2006 no-build operations. <br />