My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 02-22-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/22/2005
>
5.6. SR 02-22-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:14 AM
Creation date
2/18/2005 9:42:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />January 18, 2005 <br />File: 824880J-0240 <br /> <br />Mr. Scott Harlicker <br />Senior Planner <br />Gty of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: ST. ANDREW'S CHURCH EXPANSION <br /> <br />Dear Mr. Harlicker: <br /> <br />As requested, we have reviewed the plans submitted for the proposed expansion to the St. <br />Andrew's Church facilities. The plans were prepared by G.L.T. Architects and Larson <br />Engineering and consisted of an existing site plan, grading, drainage and erosion control <br />plan, utility plan, and construction details along with drainage calculations. Based on our <br />review and comments received at the staff review meeting, we would offer the following <br />comments: <br /> <br />1. The proposal is to remove the old church building and the gymnasium! cafeteria. New <br />construction would consist of an addition connecting the existing grade school to the <br />new church building, along with a small addition in the southeast comer of the new <br />church building. <br /> <br />2. A requirement of the demolition permit should be that all trucks accessing and leaving <br />the site should go east on 4th Street to Gates Avenue, then north along Gates/Freeport <br />Avenue to School Street, and then east on School Street to access Trunk Highway 169. <br />This route will avoid construction traffic either south on J ackson Avenue in the vicinity <br />of Trunk Highway 10 and J ackson Avenue, or east on Main Street near the intersection <br />of Main Street and Trunk Highway 169. <br /> <br />3. The storm drainage calculations appear to be adequate for the proposed changes in the <br />St. Andrew's Church campus. <br /> <br />4. The addition is proposed to gain sanitary sewer service by constructing a new 4" service <br />in the existing facility under Irving Avenue, bringing the service into the southwest <br />comer of the addition. A new 6" waterline is proposed to be brought in from the <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br /> <br />www.cLelk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.