Laserfiche WebLink
t. <br /> Opinion of Probable Construction Costs-Conceptual Design C!"Steve n S <br /> City of Elk River Outdoor Skating Facility ,,,;.,,,,35 ,,,,,,,k„, 5, ..,,s <br /> Elk River,Minnesota <br /> File No.900.16.000 Date: 2.28.17 <br /> Costs include:escalation,general conditions,contractor profit,insurance,bonds Revised: <br /> Disclaimer: This cost estimate is based one telephone conversion with the City and similar project experience and not part of commissioned study <br /> of any kind. There were no drawings or plans to review. We recommend a study be performed to verify conditions,scope,and improve accuracy of costs. <br /> The cost estimate is provided as a rough order of magnitude only. <br /> Item Description Units Qty Unit Price Total <br /> BASE BID <br /> DIVISION 13-SPECIAL CONSTRUCTION <br /> 1 Rink Floor-Outdoor refrigerated rink floor 65'x130' (7776 SF ea x 2=15,552 SF) EA 15552 $35 $544,320 <br /> 2 Additional transmission mains to rink floors EA 2 $30,000 $60,000 <br /> 3 Dasherboards for outdoor rinks 65x130 EA 2 $90,000 $180,000 <br /> 4 Refrigerated skating path(12'wide x 1,000'long) SF 12000 $65 $780,000 <br /> 5 Decorative railing system around path LF 2,024 $100 $202,400 <br /> 6 Common industrial grade refrigeration system with computerized controls.Waste heat LS 1 $2,000,000 $2,000,000 <br /> recovery for snow melt pit. <br /> 7 New perimeter concrete LS 1 $500,000 $500,000 <br /> 8 Resurfacer room SF 600 $300 $180,000 <br /> 9 Refrigeration room SF 1200 $300 $360,000 <br /> 10 Warming house and concession+skate flooring SF 1600 $400 $640,000 <br /> 11 Skate flooring SF 2000 $20 $40,000 <br /> Subtotal $5,486,720 <br /> RELAI D WORK NOT INCLUDED IN THIS COST ESTIMATE 51 <br /> n s; <br /> 1 Site work and site utilities SF 32000 $6 $192,000 <br /> 2 Demolition of existing facilities 0 $0 <br /> 3 Landscaping Allowance 1 $35,000 $35,000 <br /> 4 Site furnishings and(benches,tables,etc.) Allowance 1 $15,000 $15,000 <br /> 5 FFE(nets,resurfacers,edger's,tools,etc.) LS 1 $150,000 $150,000 <br /> 6 Site lighting and electrical LS 1 $110,000 $110,000 <br /> Subtotal $502,000 <br /> Subtotal of Construction Cost $5,988,720 <br /> Cost adjustment for <br /> Subtotal project location 0.0% $0--�...._.,�. � .., <br /> $5,988,720 <br /> Estimate,Design and Construction Contingency 20.0% $1,197,744 <br /> Total Estimated Construction Cost(2017) $7,186,464 <br /> Engineering,legal,financial,and administrative 20.0% $1,437,293 <br /> Material Testing Services-Design Phase $20,000 <br /> Material Testing Services-Construction Phase(concrete,etc.) $10,000 <br /> TOTAL ESTIMATED PROJECT COST(2018) $8,653,757 <br /> Adjusted cost for 2019 4.0% $8,999,907 <br /> Adjusted cost for 2020 4.0% $9,359,903 <br /> 1 <br />